Laserfiche WebLink
Exhibit A (Scope of Work) <br />• Health Department application prepared and submitted by Owner (if required) <br />• Coordinate with Planning and Building department for permit documents and <br />permit intake requirements <br />• Permit application <br />• Building department corrections as necessary <br /> <br />Part V <br />Bid Phase Assistance <br />• Assist with contractor RFl's, substitution request, etc. <br />• Assist with Pre-bid addenda preparation <br /> <br />Part VII <br />Structural Drawings <br />Structural Calculations. <br /> <br />Part VIII <br />Mechanical Drawings <br />• Added HVAC/refrigeration. <br />• Energy Code Calculations. <br /> <br />Part IX <br />Electrical Drawings <br />• New Lighting <br />• New Power Requirements. <br />• Energy Code Calculations. <br />• Backup power generator <br /> <br />Part X <br />Security Drawings <br />• 1. Evidence Room Requirements <br /> <br /> <br />