My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026/04/01 Council Agenda Packet
>
Council Agenda Packets
>
2026
>
2026/04/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 9:58:44 AM
Creation date
4/2/2026 9:51:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Coordination with the Structural, Mechanical, Electrical, and Security <br />Consultants. <br />• Coordination with the Planning and Building Departments for proposed project. <br />• Coordinate with Contractor for initial estimating and bid review meetings. <br /> <br />3. Professional Cost Estimation Services <br />• Provide 60% document and 90% document completion professionally prepared <br />cost estimates. <br />4. Construction Drawings <br />• Cover sheet. <br />• Site plan. <br />• Demolition plans - first floor, second floor, and roof. <br />• Demolition reflected ceiling plans - first floor, second floor, and roof. <br />• Proposed floor plans - first floor, second floor, and roof. <br />• Proposed reflected ceiling plans - first floor, second floor, and roof. <br />• Egress plan and occupancy calculations. <br />• Building life safety systems. <br />• Equipment plans and schedule (equipment list provided by Client). <br />• Door and Room finish schedules. <br />• West exterior elevation. <br />• Coordination with the Structural, Mechanical, Electrical, and Security <br />Consultants. <br />• Interior elevations of built-ins, kitchen/break room, bathrooms, etc. (finishes to be <br />selected by Client). <br />• Miscellaneous architectural details. <br />• Specifications. <br />• Created as part of this contract. The finishes are to be selected by the Client. An <br />outline specificationIs to be provided by the architect. (Note: Client to provide a <br />comprehensive list of finishes to the architect.) <br /> • See Parts VII, VIII, IX, and X below for partial Structural, Mechanical, Electrical, <br />and Security requested items from the Client. <br /> <br />Part V <br />Bid Phase Assistance <br />• Permit review meeting with Client
The URL can be used to link to this page
Your browser does not support the video tag.