Laserfiche WebLink
<br />8-27.5 Payment ............................................................................................ 217 <br />8-28 DISTRIBUTION TROUGH .................................................................................... 217 <br />8-28.1 Description ........................................................................................ 217 <br />8-28.2 Materials ............................................................................................ 217 <br />8-28.3 Construction Requirements ............................................................... 218 <br />8-28.4 Measurement .................................................................................... 218 <br />8-28.5 Payment ............................................................................................ 218 <br />DIVISION 9 – MATERIALS ................................................................................................ 219 <br />9-03 AGGREGATES .................................................................................................... 219 <br />9-03.22 Sand Backfill for Pipe Zone (******) .................................................... 219 <br />9-04 JOINTS AND CRACK SEALING MATERIALS ...................................................... 219 <br />9-04.12 Watertight Pipe to Manhole Connection Boot (******) ........................ 219 <br />9-04.13 Flexible Coupling (******) .................................................................. 219 <br />9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS ................................ 219 <br />9-05.12 Polyvinyl Chloride (PVC) Pipe ........................................................... 219 <br />9-05.13 Ductile Iron Sewer Pipe ..................................................................... 219 <br />9-05.15 Metal Castings ................................................................................... 220 <br />9-05.23 High Density Polyethylene (HDPE) Pipe ............................................ 220 <br />9-05.24 Polypropylene Sewer Pipe ................................................................. 221 <br />9-05.32 Insertion Tee (******) ......................................................................... 221 <br />9-05.60 Casing Spacers (******) ..................................................................... 221 <br />9-05.62 Synthetic Rubber Sleeve Seal (******)................................................ 221 <br />9-05.64 Polypropylene Manhole and Hand Hold Steps (******) ...................... 221 <br />9-05.66 Polypropylene Manhole Ladder (******) ............................................. 221 <br />9-14 EROSION CONTROL AND ROADSIDE PLANTING ............................................ 221 <br />9-14.2 Soils .................................................................................................. 221 <br />9-14.3 Seed .................................................................................................. 223 <br />9-14.4 Fertilizer ............................................................................................ 223 <br />9-14.5 Mulch and Amendments .................................................................... 223 <br />9-14.7 Plant Materials ................................................................................... 223 <br />9-23 CONCRETE CURING MATERIALS AND ADMIXTURES ..................................... 224 <br />9-23.2 Liquid Membrane-Forming Concrete Curing Compounds .................. 224 <br />9-23.6 Chemical Admixtures for Concrete .................................................... 224 <br /> <br /> <br />APPENDIX A – COE STANDARD DRAWINGS <br />APPENDIX B – CHANGE ORDER FORMS <br />APPENDIX C – PUGET SOUND CLEAN AIR AGENCY RULE EXCERPTS <br />APPENDIX D – INADVERTENT DISCOVERY PLAN <br />APPENDIX E – ECOLOGY FUNDING SPECIFICATION INSERT <br />APPENDIX F – NOISE ORDINANCE <br />APPENDIX G – CONSTRUCTION EASEMENTS