Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 101 <br />work week. Should Contractor elect to work on a holiday or weekend, those normal <br />working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight time 8-hour <br />working period for the Contract shall be established at the preconstruction conference <br />or prior to the Contractor commencing the Work. <br />When connecting to existing water mains and services are required, the City will obtain <br />all necessary permissions and the normal hours of work shall be any consecutive 8-hour <br />period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br />weekend connection work time requirements. <br />If a Contractor is required to or desires to perform Work on holidays, weekends, or before <br />7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in writing to the <br />Engineer for permission to work such times. Permission to work longer than an 8 -hour <br />period between 7:00 a.m. and 6:00 p.m. is not required. Such requests shall be <br />submitted to the Engineer no later than noon on the working day prior to the day for <br />which the Contractor is requesting permission to work, unless a noise variance will be <br />required. In such case provide request a minimum of 30 days prior to performing the <br />work in accordance with 1-07.1(7) NOISE. <br />Permission to work Saturdays, Sundays, holidays or other than the agreed upon normal <br />straight time working hours Monday through Friday may be given subject to certain other <br />conditions set forth by the City or Engineer. These conditions may include, and not be <br />limited to; requiring the Contractor to reimburse the City for the costs in excess of <br />straight-time costs for City employees and necessary assistants who worked during such <br />times, on non-Federal aid projects. Assistants may include, and are not limited to, <br />survey crews; personnel from the City’s material testing lab; inspectors; and other City <br />employees when in the opinion of the Engineer, such work necessitates their presence. <br />The work performed on Saturdays, Sundays, and holidays will be considered as working <br />days with regards to the Contract Time; and considering multiple work shifts as multiple <br />working days with respect to Contract Time even though the multiple shifts occur in a <br />single 24-hour period. <br />1-08.0(3) Reimbursement for Overtime Work of City Employees and <br />Assistants <br />Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br />an 8-hour work shift on a regular working day, as defined in the Standard Specifications, <br />such work shall be considered as overtime work. On all such overtime work an inspector <br />will be present, and a survey crew may be required at the discretion of the Engineer. If <br />such work is the result of Contractor’s inability to complete work or coordinate materials, <br />equipment and labor in accordance with agreed schedule, then the City may deduct from <br />amounts due or to become due to the Contractor for the costs in excess of the straight- <br />time costs for employees and assistants of the City required to work overtime hours. <br />The Contractor by these specifications does hereby authorize the Engineer to deduct <br />such costs from the amount due or to become due to the Contractor. <br />1-08.1 Subcontracting <br />Delete 1-08.1(7)A Payment Certification and substitute the following: <br />On all projects funded only with City funds, the Contractor shall certify to the actual <br />amounts paid Disadvantaged, Minority, or Women’s Business Enterprise firms that were <br />used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br />service providers on the Contract. This certification shall be submitted to the Engineer <br />on WSDOT form 140-542 within 20 calendar days after physical completion of the <br />Contract. <br />Supplement 1-08.1 by adding the following: