My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 102 <br />The Contract Documents shall apply to Subcontractors and suppliers as if each had <br />signed the Contract with the City. Contractor shall include the provisions of these <br />Contract Documents or a “flow down” clause in each contract with Subcontractors and <br />suppliers. <br />The City will not approve a Subcontractor that is also providing services to the City on <br />the same project. <br />In addition to any other requirement in this Section, no Subcontractor or lower tier <br />subcontractor will be permitted to perform Work under the Contract until the following <br />documents have been completed and submitted to the Engineer: <br />1. Request to Sublet Work (Form 421-012), and <br />2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br />Federal-aid Projects (Form 420-004). <br />The Contractor’s records pertaining to the requirements of this Special Provision shall <br />be open to inspection or audit by representatives of the City during the life of the Contract <br />and for a period of not less than three years after the date of acceptance of the Contract. <br />The Contractor shall retain these records for that period. The Contractor shall also <br />guarantee that these records of all Subcontractors and lower tier subcontractors shall <br />be available and open to similar inspection or audit for the same time period. <br />In addition to any other requirement in this Section, Contractor shall not sublet to a single <br />Subcontractor more than one-half of the Project. The City may refuse to approve any <br />subcontract for any reason. Subcontractors will be considered agents of the Contractor <br />and their work shall be subject to the provisions of the Contract. References in the <br />Contract Documents to actions required of Subcontractors, manufacturers, suppliers, or <br />any person other than the Contractor, the City or the City’s Representative shall be <br />interpreted as requiring that the Contractor shall require such Subcontractor, <br />manufacturer, supplier or person to perform the specified action. <br />1-08.3 Progress Schedule <br />1-08.3(1) General Requirements <br />Delete 1-08.3(1) and substitute the following: <br />1-08.3(1) General <br />(******) <br />Because time is of the essence, diligent and expeditious progress and completion of the <br />Work by the Contract Completion Date is required of the Contractor. Careful, adequate, <br />accurate and complete planning and scheduling of the Work by the Contractor, both prior <br />to the start of, and throughout, construction, is vital to the success of this Project for both <br />the Contractor and the City. The purposes of the schedules and reports include: <br />1. Ensuring adequate planning and execution of the Work by the Contractor. <br />2. Assisting the City or its representative in monitoring construction. <br />3. Assessing the impact of any actual, potential or proposed change, including, <br />but not limited to, the financial impact resulting from schedule changes and <br />changes to the scope of Work. <br />4. Supporting the basis for construction payments. <br />5. Planning by City and tenants. <br />6. Avoiding additional or extra costs or expenses to the City. <br />All schedules will be reviewed by the City and the City’s Representative. The City or <br />City’s Representative’s review of any schedule shall not transfer the Contractor’s <br />responsibilities to the City. Review shall not constitute approval or acceptance of the <br />Contractor's construction means, methods, sequencing, logic, order, precedence and