My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 103 <br />succession of activities or Contractor’s ability to complete the Work in a timely manner. <br />Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br />of logic, order, precedence, and duration, are and remain the Contractor's. The City or <br />City’s Representative may, however, comment upon the schedule. The Contractor <br />remains wholly responsible for completing the Work within the Contract duration. Any <br />comments by City or City’s Representative personnel regarding the schedule shall not <br />be construed as approval or ratification, nor shall the Contractor incorporate or change <br />its schedule as a result of City or City’s Representative comments in the absence of an <br />express written directive to that effect. <br />Contractor shall submit, update and maintain schedules as required by the Contract <br />Documents. <br />The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br />milestones, Substantial Completion, Physical Completion and Completion Dates <br />provided by the Contract Documents. The City allocates its resources to a Contract <br />based on the total time allowed in the Contract. The Contractor may submit a schedule <br />indicating Completion Date earlier than the end of Contract Time, but City cannot <br />guarantee its resources will be available to meet such schedule. City shall not pay or be <br />liable for any additional compensation if the Contractor is not able to meet a schedule <br />that indicates a Completion Date earlier than the end of Contract Time. <br />Failure to schedule City furnished or installed materials and Equipment for installation <br />on or after its planned arrival pursuant to the City’s Contract with the supplier or failure <br />to notify the City in writing of tasks dependent upon the fact or date of arrival of such <br />City furnished materials and Equipment, constitute a waiver by Contractor of any <br />Contract Claim arising out of or related to the timeliness of the furnishing or installation <br />of such material and Equipment. All schedules shall allow for timely incorporation of any <br />other's work under separate contract with City and for timely incorporation of any work <br />provided and installed by City. Unless otherwise expressly authorized in writing by the <br />City’s Representative, the Contractor shall integrate the schedules with the Schedule of <br />Values and unit price items so that each construction activity is represented by a dollar <br />value. <br />Float in a progress schedule belongs to the City. <br />Subcontractors shall review all schedules prior to submission to the City and City’s <br />Representative. At the City’s option and sole discretion, City may require Contractor to <br />obtain written acceptance of each schedule by Subcontractors as practical and feasible, <br />as the schedule relates to Subcontractors’ work. <br />Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br />duration. Contractor shall use its best efforts in good faith to set reasonable durations <br />for all activities. Contractor shall not attempt to “grab the Float” or make an effort to use <br />Float in the Progress Schedule for the benefit of the Contractor, rather than the benefit <br />of the Project. Contractor shall use its best efforts in good faith to minimize <br />dependencies, minimize the number of critical paths, and schedule the Project to be <br />complete as expeditiously as reasonably possible. <br />Contractor shall submit with each application for payment or progress pay estimate an <br />updated progress schedule, but no less often than monthly. If requested by the City’s <br />Representative or the City, Contractor shall prepare and submit updated progress <br />schedules from time to time that may be more frequent than monthly. <br />The Contractor hereby expressly agrees and acknowledges that any failure by <br />Contractor to provide accurate, complete, current and updated schedules at least <br />monthly constitutes a waiver of any and all claims or requests for adjustment of Contract <br />Sum or Time that arise out of, result from, or are caused by, any Delay on the Project or
The URL can be used to link to this page
Your browser does not support the video tag.