My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 105 <br />brought to the attention of the City’s Representative and City along with the <br />schedule update. <br />An updated progress schedule shall show changes occurring since submission of <br />the previous updated progress schedule such as: <br />1. Major changes in scope; <br />2. Activities modified since previous submission; <br />3. Revised projection for construction completion, as applicable; and <br />4. Any other changes. <br />Contractor shall submit an updated progress schedule for review by the City and <br />City’s Representative, at the weekly construction meeting or as otherwise as <br />requested by City’s Representative or City. Any deviation from the Baseline <br />Schedule shall be explained by the Contractor, including the cause and effect of the <br />deviation. Contractor shall state in writing the corrective measures it will take to <br />bring the progress of the Work back in line with the Baseline Schedule. <br />Once an actual start or completion date is stated in a submitted progress schedule, <br />Contractor shall not change schedule without prior written agreement of the City <br />and City’s Representative. <br />With each submitted updated progress schedule, Contractor shall provide a written <br />narrative report that identifies anticipated or actual deviations from the Baseline <br />Schedule, causes of the deviations, and the impact of the deviations on the <br />schedule and describes the corrective action taken or proposed, and its effect. <br />1-08.3(3) Schedule Updates <br />Delete 1-08.3(3) and substitute the following: <br />1-08.3(3) Schedule Format And Content <br />(******) <br />1-08.3(3)A Schedule Format <br />All schedules shall be in the following form: <br />1. Network analysis system using the current version of Microsoft Project <br />software (or other software acceptable to the City Representative) and <br />the critical path method, as outlined in The Associated General <br />Contractors of America (AGC) publication "The Use of CPM in <br />Construction -A Manual for General Contractors.” <br />2. Sequence of Listings: The chronological order of the start of each activity <br />of Work. Listings on Progress Schedule and Schedule of Values shall be <br />the same. <br />3. Scale and Spacing: To provide space for notations and revisions. <br />4. Each schedule and update shall be provided in three (3) paper copies <br />and one electronic copy in current Microsoft Project format (or other <br />format acceptable to the City Representative). Paper copies shall be on a <br />single sheet of paper and of sufficient size to allow legibility of schedule. <br />Pieces of the schedule on separate sheets of paper that must be taped <br />together to form schedule are not permitted. Electronic copies shall be <br />submitted on either separate CD-ROMs or as email attachment to City’s <br />Representative or as otherwise acceptable to the City Representative. <br />5. Updated Progress Schedules shall indicate progress of the Work to the <br />date of submission by drawing a vertical line down the schedule to <br />represent Work completed to date.
The URL can be used to link to this page
Your browser does not support the video tag.