My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 109 <br />The Engineer will give the Contractor written notice of the Completion Date of the <br />Contract after all the Contractor’s obligations under the Contract have been performed <br />by the Contractor. The following events must occur before the Completion Date can be <br />established: <br />1. The physical Work on the project must be complete; and <br />2. The Contractor shall furnish all documentation required by the Contract <br />and required by law, to allow the City to process final acceptance of the <br />Contract. The following documents must be received by the Engineer <br />prior to establishing a Completion Date: <br />a. Certified payrolls. <br />b. Material Acceptance Certification Documents. <br />c. Annual Report of Amounts Paid as MBE/WBE Participants. <br />d. Final Contractor Voucher Certification. <br />e. Copies of the approved “Affidavit of Prevailing Wages Paid” for <br />the Contractor and all Subcontractors. <br />f. A copy of the Notice of Termination sent to the Washington State <br />Department of Ecology (Ecology); the elapse of 30 calendar days <br />from the date of receipt of the Notice of Termination by Ecology; <br />and no rejection of the Notice of Termination by Ecology. This <br />requirement will not apply if the Construction Stormwater General <br />Permit is transferred back to the City in accordance with Section <br />8-01.3(16) <br />1-08.5(2) Substantial Completion <br />(******) <br />When the Contractor considers the Work to be Substantially Complete and ready for its <br />intended use, it shall give Notice to the City’s Representative. The Notice shall include <br />an itemized list of remaining incomplete Work. If the City’s Representative determines <br />the Work is not substantially complete, it will so notify the Contractor in writing, identifying <br />the reasons for such a determination. If the City’s Representative finds the Work <br />substantially complete, it will meet with the Contractor to (1) prepare a Punch List of <br />incomplete items of Work; (2) define the division of responsibility between City and <br />Contractor with respect to security, operation, maintenance, heat, utilities, insurance, <br />and warranties; and (3) describe other issues related to acceptance of the substantially <br />completed Work. <br />If the City’s Representative is not an employee of the City, the City’s Representative will <br />write to the City upon reaching agreement with the Contractor, certifying that the Work <br />is substantially complete, listing the items of incomplete Work, stating the date for <br />completion of incomplete work, defining the division of responsibilities, and setting forth <br />any other terms related to acceptance. In such event, the City will review the City’s <br />Representative's certification that the Work is substantially complete. If the City concurs, <br />the City will notify the Contractor in writing that the Work is accepted as substantially <br />complete. Except for any portion(s) of Work specified for early completion or required <br />by the City for early possession, Substantial Completion will not occur for Work until the <br />entire Project is ready for possession and use. The acceptance Notice will include a <br />Punch List of incomplete Work items and corrective Works, set the date for their <br />completion and repair, describes the division of responsibility between the City and <br />Contractor, and describe other terms of acceptance. The Contractor will acknowledge <br />receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br />provisions.
The URL can be used to link to this page
Your browser does not support the video tag.