My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 113 <br /> <br />Accordingly, the Contractor agrees: <br /> <br />1. To pay (according to the following formula) liquidated damages for each <br />working day beyond the number of working days established for Physical <br />Completion, and <br /> <br />2. To authorize the Engineer to deduct these liquidated damages from any <br />money due or coming due to the Contractor. <br /> <br />Liquidated Damages Formula <br /> <br />LD=0.15C/T <br /> <br />Where: <br /> <br /> LD = liquidated damages per working day (rounded to the nearest dollar) <br /> C = original Contract amount <br /> T = original time for Physical Completion <br /> <br />When the Contract Work has progressed to Substantial Completion as defined in the <br />Contract, the Engineer may determine that the work is Substantially Complete. The <br />Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br />overruns in Contract time occurring after the date so established, the formula for <br />liquidated damages shown above will not apply. For overruns in Contract time occurring <br />after the Substantial Completion Date, liquidated damages shall be assessed on the <br />basis of direct engineering and related costs assignable to the project until the actual <br />Physical Completion Date of all the Contract Work. The Contractor shall complete the <br />remaining Work as promptly as possible. Upon request by the Project Engineer, the <br />Contractor shall furnish a written schedule for completing the physical Work on the <br />Contract. <br />1-08.10 Termination of Contract <br />1-08.10(1) Termination for Default <br />Delete all of 1-08.10(1) and substitute the following: <br />The City may terminate the Contract upon written notice to Contractor and its Surety <br />whenever the Contractor is deemed to be in default or fails to fulfill, in a timely and <br />proper manner, one or more Contract obligations, or is in violation of any provisions <br />or covenants of the Contract. Termination shall be effective upon Contractor’s and <br />Surety’s receipt of such notice <br />For purposes of this section, the Contractor shall be deemed to be in default upon <br />the occurrence of one or more of the following events: <br />1. If Contractor is bankrupt or insolvent. <br />2. If Contractor makes a general assignment for the benefit of creditors. <br />3. If a trustee or receiver is appointed for Contractor, or for any of <br />Contractor's property. <br />4. If Contractor files a petition to take advantage of any debtor's law, or to <br />reorganize under any bankruptcy chapter or law.
The URL can be used to link to this page
Your browser does not support the video tag.