Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 116 <br />termination shall be treated as a termination for the City’s convenience pursuant to 1- <br />08.10(2) TERMINATION FOR PUBLIC CONVENIENCE. <br />1-08.10(7) Contractor Obligations upon Termination <br />(******) <br />On receipt of notice of termination, the Contractor shall immediately discontinue the <br />Work but shall do such Extra Work as may be ordered by the City’s Representative or <br />City to safeguard the Work then completed and the materials and Equipment then <br />delivered to the site of the Work and to leave the Work in a safe and useful condition. <br />Payment for this Extra Work will be made in accordance with 1-09.4 EQUITABLE <br />ADJUSTMENT. <br />1-08.10(8) Ownership of Materials upon Termination <br />(******) <br />As of the termination date, whether effected by the City or Contractor as provided herein, <br />all the Contractor's right, title, and interest in and to materials ordered by the Contractor <br />prior to termination, whether or not they have been delivered to the site of Work, shall <br />be vested in the City, and the Contractor shall, upon demand of the City, execute and <br />deliver to the City all requisite bills of sale, assignments, and other documents of transfer <br />that may be necessary to give effect to the intention of the termination procedures set <br />forth above. <br />1-08.10(9) Opportunity to Cure <br />(******) <br />If the Contractor has not already had an opportunity to cure the default or breach the <br />City shall specify the default or breach and may provide a reasonable period of time to <br />allow the Contractor to cure the default or breach. The notice of termination will state <br />the time period, if any, in which cure is permitted and other conditions as the City, in its <br />sole judgment, shall deem appropriate. If (1) a time period is so provided and if <br />Contractor fails to remedy the breach or default or any of the terms, covenants, or <br />conditions of this Contract to the City’s satisfaction within the time period specified or (2) <br />no time period is provided, then the City shall have the right to terminate the Contract <br />without any further obligation to the Contractor. Any such termination for default shall <br />not in any way operate to preclude the City from also pursuing all available remedies <br />against Contractor and its sureties for said breach or default. <br />1-08.10(10) Waiver of Remedies for Any Breach <br />(******) <br />In the event that the City elects to waive its remedies for any breach by Contractor or <br />any covenant, term or condition of this Contract, such waiver by the City shall not limit <br />the City’s remedies for any succeeding breach of that or of any other term covenant, or <br />condition of this Contract. <br />1-08.10(11) Possession and Use of Completed Portions of the Work <br />(******) <br />The City shall have the right to take possession of and use completed or partially <br />completed portions of the Work even though the time for completing the Work for such <br />portions may not have expired. Operations and maintenance costs of use of such work <br />will be borne by the City. Such possession and use shall not be deemed as acceptance <br />of the Work. If such prior possession or use increases the cost of the Work, the <br />Contractor may be entitled to request extra compensation by giving Notice and following <br />the procedures of 1-04.5 NOTICE BY THE CONTRACTOR and 1-09.11 DISPUTES <br />AND CLAIMS within five calendar days of each occurrence. The Contractor shall not <br />submit a Contract Claim for possession by the City of portions of the Work specifically