My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 117 <br />required in the Contract Documents to be placed into use or operation or both before <br />completion of the entirety of the Work. <br />1-08.10(12) Possession of Incomplete Portions of the Project <br />(******) <br />Should the Contractor fail to meet any date specified for Substantial Completion or <br />Physical Completion of Work or any portion of Work requiring early possession and use <br />by the City, the City may, after a 14 calendar day Notice to the Contractor, take over such <br />portion or any Work that is behind schedule. In such case, the City’s Representative will <br />prepare a list of incomplete Work taken over by the City. The cost of City's work will be <br />charged to and deducted from amounts due to the Contractor. The Substantial <br />Completion date of the entire or a portion of the Project will be established as the date <br />when the City actually begins using the Project or portion of the Project for its intended <br />purpose. Division of responsibilities between City and Contractor, beginning of <br />warranties, and any other issues relating to Substantial Completion shall be as specified <br />in 1-08.5(2) SUBSTANTIAL COMPLETION. <br />Supplement Section 1-08 by adding the following: <br />1-08.11 Record Drawings <br />(******) <br />1-08.11(1) Description <br />This section specifies the requirements for preparing record drawings. The Contractor, <br />with the cooperation and assistance of the City Inspector, is responsible for marking up <br />record drawings during the course of construction. The Contractor shall keep the record <br />drawings up to date at all times during the course of construction. <br />The Inspector will verify the record drawings are accurate and complete before accepting <br />the Contractors monthly pay request. If the record drawings are not current or accurate, <br />the pay request will not be processed. <br />As the Contract approaches Final Acceptance, prepare, with the assistance of the <br />Inspector, a complete and accurate set of record drawings. The Inspector must approve <br />the record drawings prior to Final Acceptance. Final Acceptance will not be issued until <br />the City accepts the record drawings. <br />1-08.11(2) Recording Changes <br />As a minimum, record the following items on the record drawings: <br />a. Actual dimensions, arrangement and materials used when different than <br />shown on the Plans. <br />b. Changes made by Change Order or Field Order. <br />c. Changes made by the Contractor. <br />d. Horizontal and vertical locations of underground utilities and appurtenances, <br />shall be referenced to monumentation. The monumentation shall be based <br />on NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br />e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br />elevations. <br />f. Details, Equipment or materials used that were not shown on the original <br />Plans. <br />g. The actual arrangement and routing of conduit, embedded conduit, raceways <br />and piping relative to its location and proportioned to other work. The location <br />needs to be dimensioned on the record drawings.
The URL can be used to link to this page
Your browser does not support the video tag.