My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 119 <br />1-09.3(1) Schedule of Values <br />(******) <br />The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br />CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br />in part, then the Schedule of Values for that portion of the Work shall also be based on <br />unit prices. If the Proposal Form calls for a lump sum price, in whole or in part, then the <br />Schedule of Values shall: reasonably allocate the Contract Sum among the various <br />portions of the Work; be complete; be organized to include detailed breakdown of each <br />major unit of the Work; be organized to correspond to Contractor’s schedule; break down <br />the Contract Sum showing the value assigned to each part of the Work; include an <br />allowance for profit and Overhead; include Unit Price Work, if and to the extent indicated <br />on the Proposal Form; be so organized as to facilitate assessment of Work and payment <br />of Subcontractors; and be balanced. To the greatest extent possible, the breakdown <br />shall use the same tasks or units as the Contractor’s schedule. Contractor shall provide <br />documentation substantiating the cost allocation if asked by the City’s Representative. <br />Upon acceptance of the Schedule of Values by the City’s Representative, it shall be used <br />as a basis for all requests for payment. <br />1-09.4 Equitable Adjustment <br />Supplement 1-09.4 by adding the following: <br />Other means to establish the reasonable cost of the Work not defined by unit prices <br />include, and is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br />estimating manuals. <br />1-09.4(1) General <br />(******) <br />The following shall apply in determining the amount of an equitable adjustment of <br />Contract Sum: <br />1. Except as otherwise expressly provided, Contractor will only be paid for costs <br />it clearly and convincingly proves it actually and directly incurred, and shall <br />not include consequential or indirect damages not otherwise expressly <br />permitted by the Contract Documents. Costs and damages for which the <br />City shall not be liable under any circumstances include, but are not limited <br />to: (a) borrowing or interest costs, charges, or expenses of Contractor; (b) <br />alleged lost profit or overhead on any other project; and (c) Contractor’s <br />failure or inability to obtain other work. <br />2. No Contract Claim for adjustment of Contract Sum or additional <br />compensation for extra, affected, impacted or inefficient work will be allowed <br />where the Contractor does not keep and maintain contemporaneous, <br />complete and accurate time records for labor and equipment and <br />contemporaneous, complete and accurate records for materials and where <br />such records do not contemporaneously segregate and allocate by time, <br />location and Work the time and costs for each item or element of such Work. <br />Contractor’s failure to keep and maintain such records constitutes a waiver of <br />any Contract Claim or request by the Contractor for adjustment of Contract <br />Sum for such costs or event. <br />3. To the extent the Contractor is entitled to an adjustment of Contract Sum due <br />to any Delay or extension of Contract Time, Contractor shall be compensated <br />as provided in 1-09.11A REMEDIES. Such compensation shall be full, <br />adequate and complete compensation for all direct, indirect, cumulative, <br />inefficiency, impact and ripple costs causing, arising out of, or relating to such <br />Delays or extension.
The URL can be used to link to this page
Your browser does not support the video tag.