My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 120 <br />4. Contractor and City agree that compensation to the Contractor for a Contract <br />Claim shall not exceed the Contractor’s costs based upon Force Account as <br />described in 1-09.6 FORCE ACCOUNT. Contractor waives, releases, and <br />agrees not to submit any request for adjustment of Contract Sum or Contract <br />Claim based upon a “total cost” or “modified total cost” calculation, in whole or <br />in part, but instead agrees that any and all requests for compensation shall be <br />based upon accurate, complete and contemporaneous cost records that <br />segregate and allocate costs (a) between base Contract work and the Work <br />for which additional compensation is sought and (b) between each item of <br />Work for which additional compensation is sought. Claims for inefficiency <br />shall only be based and calculated by a comparison of productivity of similar <br />Work performed in an unaffected or least affected area of the Project. <br />5. No claim for consequential damages of any kind will be allowed. <br />Supplement 1-09.4 by adding the following: <br />1-09.4(3) COVID-19 Equitable Adjustments <br />Contractor’s Bid includes all costs necessary for the duration of the Work for <br />compliance with COVID-19 Requirements. Contractor’s Bid takes into account that <br />COVID-19 Requirements may create direct and indirect costs, including inefficiency and <br />Delay. <br />Contractor shall have no entitlement to an equitable adjustment or other increase to the <br />Contract Sum for any direct or indirect costs (including without limitation Delay, <br />cumulative impact, inefficiency or ripple costs) incurred by the Contractor to comply with <br />the COVID-19 Requirements. <br />1-09.5 Deleted or Terminated Work <br />Delete the first paragraph, beginning with “The Engineer may delete”, and the second <br />paragraph, beginning with “Payment for completed items”, and substitute the following: <br />The City’s Representative may delete Work as provided in 1-04.4 CHANGES or may <br />terminate the Contract in whole or part as provided in 1-08.10(2) TERMINATION FOR <br />PUBLIC CONVENIENCE. When the Contract is partially terminated for the City’s <br />convenience, the partial termination shall be treated as a deductive Change Order for <br />payment purposes under this section. <br />Payment for completed items will be at contract unit prices or pursuant to the Schedule <br />of Values. <br />Delete the fourth paragraph, beginning with “Contract time shall be”, and the fifth paragraph, <br />beginning with “Acceptable materials ordered by”, and substitute the following: <br />Acceptable materials ordered by the Contractor prior to the date the Work was <br />terminated or deleted will either be purchased from the Contractor by the City at the <br />actual cost and shall become the property of the City, or the City will reimburse the <br />Contractor for the actual costs of returning these materials to the suppliers. <br />If Contractor disagrees with the adjustment of Contract Sum determined by the City’s <br />Representative, Contractor may submit a Contract Claim for the difference between the <br />amount determined by the City’s Representative and the amount sought by the <br />Contractor. <br />Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br />uncompleted Work. <br />1-09.6 Force Account <br />Supplement 1-09.6 by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.