My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Greely St. Water Quality Retrofit Division B – BID DESCRIPTIONS January 2026 <br />WO No. UP3817 SP - 26 <br /> <br />DIVISION B - BID ITEM DESCRIPTIONS <br />Bid Item 1 - Mobilization <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of <br />Contractor’s preconstruction costs of preparatory work and operations including, but not <br />limited to, those necessary for the movement of the Contractor’s personnel, equipment, <br />supplies and incidentals to the Project; for the establishment of its offices, buildings and other <br />facilities necessary for Work on this Project; for premiums on bonds and insurance for the <br />Project, and for Work and operations that the Contractor must perform or costs it must incur <br />before beginning production work on the various items on the Project. Mobilization also <br />includes, but is not limited to, posting construction identification signs, securing permits, <br />establishing safety and security measures, preparing a traffic control plan(s), preconstruction <br />photographs, developing a Schedule of Values for lump sum bid items, submitting the project <br />schedule and providing product and material submittals, and posting of notices and jobsite <br />posters as required by WSDOT 1-07.9(2). Also include mobilization costs for all <br />subcontracted work along with all costs for utility coordination noted on the Plans and in the <br />Specifications. <br />Items not included in this item include, but are not limited to: <br />(a) Work covered by a specific bid item or Work that is to be included in a bid item <br />or items. <br />(b) Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(c) When 5% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for mobilization, or 5% of the total original contract <br />amount, whichever is the least, will be paid. <br />(d) When 10% of the total original contract amount is earned from other bid items. <br />100% of the amount bid for mobilization, or 10% of the total contract amount, <br />whichever is the least, will be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% <br />of the total original contract amount will be paid. <br />Bid Item 2 - Surveying <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with <br />furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br />the setting and monitoring the location, elevation, alignment and grade of the Work as <br />specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br />and the Plans. <br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing <br />all labor, tools, survey instruments, materials and other equipment necessary for verifying the <br />rim and invert elevations, prior to construction, of all existing manholes and pipes where <br />connections are to be made. <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(e) When 10% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for surveying will be paid. <br />(f) When redlines are received for preparing RECORD DRAWINGS, 100% of the <br />amount bid for surveying will be paid. <br />Bid Item 3 - Record Drawings
The URL can be used to link to this page
Your browser does not support the video tag.