Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Greely St. Water Quality Retrofit Division B – BID DESCRIPTIONS January 2026 <br />WO No. UP3817 SP - 27 <br /> <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum bid for record drawings includes, but is not limited to, all costs associated with <br />furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br />obtaining the “as constructed” location and elevations of the Work, in particular, sewer pipe <br />invert elevations and other information necessary for production of the Record Drawing (As- <br />Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br />these Special Provisions. <br />When redlines are received for preparing RECORD DRAWINGS, including all information <br />described above, 100% of the amount bid for record drawings will be paid. <br />Bid Item 4 - SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br />includes, but is not limited to, all costs associated with complying with the requirements of <br />Section 1-07.15(1) of the Standard Specification. <br />Bid Item 5 - Force Account/Unexpected Conditions <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer, <br />except work described in item (a) below, which may be initiated by the Inspector in the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(a) Restoration of existing special private improvements including, but not limited to, <br />brick or stone walkways, decorative concrete walks or driveways, concrete <br />masonry or stone walls, rockeries, fences, landscape plantings, including but not <br />limited to, hedges, trees, flowerbeds, irrigation systems, yard lighting, rockeries, <br />retaining walls, handrails, or steps. <br />(b) Control Density Fill backfill, where directed by the Engineer, to fill trenches and <br />excavations where conventional backfill cannot be adequately compacted. <br />(c) Adjust or replace water or sanitary sewer services to resolve conflict with new <br />stormwater systems. <br /> <br />Bid Item 6 - Traffic Control Labor <br />Measurement and Payment: Unit Price per Hour (HR)