My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 86 <br />Contractor shall submit a dust control plan including dust control measures for its <br />activities related to this Contract that may cause dust. This plan shall be submitted <br />to the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the Contractor’s <br />Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of Everett. <br />All general building, electrical, plumbing permits will be issued at no cost to the <br />Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br />disposal sites shall be in the United States, unless otherwise expressly stated in the <br />Contract Documents or the City gives prior written approval. <br />This Project contains less than one acre of total disturbed area within the project <br />limits and does not require Contractor to apply for Ecology’s Construction <br />Stormwater General Permit. <br />1-07.9 Wages <br />1-07.9(1) General <br />Delete the first paragraph of 1-07.9(1) and substitute the following: <br />This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br />RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br />prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br />Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br />responsible to use the schedule in effect at the Bid Opening Date, determine the <br />appropriate labor classification(s), and use the appropriate and correct prevailing <br />wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br />can be obtained at the following URL: <br />https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing- <br />wage-rates <br />Printed copies of the current prevailing wage rates are available for viewing at City <br />of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br />copy of the prevailing wage rates upon written request received within 7 days of the <br />Bid Opening Date. <br />Delete the fifth paragraph of 1-07.9(1) and substitute the following: <br />If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br />the Contractor shall request a determination of the correct wage and benefits rate <br />for that class and locality from the Industrial Statistician, Washington State <br />Department of Labor and Industries (State L&I), and provide a copy of those <br />determinations to the Project Engineer. <br />Delete the final paragraph of 1-07.9(1) that begins with “There are many work-ready . . <br />. “ <br />1-07.9(5) Required Documents <br />Supplement 1-07.9(5) by adding the following: <br />The City may require payroll reports for the Contractor and every Subcontractor be <br />submitted weekly to the Construction Division, Public Works Service Center, 3200 <br />Cedar Street, Everett, Washington 98201. The payroll reports shall contain the <br />following information: <br />1. Name and residence address of each worker.
The URL can be used to link to this page
Your browser does not support the video tag.