Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 86 <br />Contractor shall submit a dust control plan including dust control measures for its <br />activities related to this Contract that may cause dust. This plan shall be submitted <br />to the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the Contractor’s <br />Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of Everett. <br />All general building, electrical, plumbing permits will be issued at no cost to the <br />Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br />disposal sites shall be in the United States, unless otherwise expressly stated in the <br />Contract Documents or the City gives prior written approval. <br />This Project contains less than one acre of total disturbed area within the project <br />limits and does not require Contractor to apply for Ecology’s Construction <br />Stormwater General Permit. <br />1-07.9 Wages <br />1-07.9(1) General <br />Delete the first paragraph of 1-07.9(1) and substitute the following: <br />This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br />RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br />prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br />Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br />responsible to use the schedule in effect at the Bid Opening Date, determine the <br />appropriate labor classification(s), and use the appropriate and correct prevailing <br />wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br />can be obtained at the following URL: <br />https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing- <br />wage-rates <br />Printed copies of the current prevailing wage rates are available for viewing at City <br />of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br />copy of the prevailing wage rates upon written request received within 7 days of the <br />Bid Opening Date. <br />Delete the fifth paragraph of 1-07.9(1) and substitute the following: <br />If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br />the Contractor shall request a determination of the correct wage and benefits rate <br />for that class and locality from the Industrial Statistician, Washington State <br />Department of Labor and Industries (State L&I), and provide a copy of those <br />determinations to the Project Engineer. <br />Delete the final paragraph of 1-07.9(1) that begins with “There are many work-ready . . <br />. “ <br />1-07.9(5) Required Documents <br />Supplement 1-07.9(5) by adding the following: <br />The City may require payroll reports for the Contractor and every Subcontractor be <br />submitted weekly to the Construction Division, Public Works Service Center, 3200 <br />Cedar Street, Everett, Washington 98201. The payroll reports shall contain the <br />following information: <br />1. Name and residence address of each worker.