My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 97 <br />1-07.18(5)G Professional Liability <br />The Contractor, its Subcontractor and its design consultant providing construction <br />management, value engineering, or other design-related non-construction <br />professional services shall provide evidence of Professional Liability insurance <br />covering professional errors and omissions. Such policy shall provide the following <br />minimum limits: <br />$2,000,000 per Claim <br />If the scope of such design-related professional services includes work related to <br />pollution conditions, the Professional Liability insurance shall include Pollution <br />Liability coverage. <br />If insurance is on a claims made form, its retroactive date, and that of all subsequent <br />renewals, shall be no later than the effective date of this Contract. <br />1-07.18(5)H Builder’s Risk <br />If the Project includes construction of a structure, the Contractor shall procure and <br />maintain during the life of the Contract, or until acceptance of the project by the City, <br />whichever is longer, “All Risk” Builders Risk or Installation Floater Insurance at least <br />as broad as ISO form number CP0020 (Builders Risk Coverage Form) with ISO <br />form number CP0030 (Causes of Loss – Special Form) including coverage for <br />collapse, theft, off-site storage and property in transit. The coverage shall insure for <br />direct physical loss to property of the entire construction project, for 100% of the <br />replacement value thereof and include earthquake. The policy shall be endorsed to <br />cover the interests, as they may appear, of the City, Contractor and subcontractors <br />of all tiers with the City and sub-contractors listed as a Named Insured. In the event <br />of a loss to any or all of the work and/or materials therein and/or to be provided at <br />any time prior to the final close-out of the Contract and acceptance of the project by <br />the City, the Contractor shall promptly reconstruct, repair, replace or restore all work <br />and/or materials so destroyed. Nothing herein provided for shall in any way excuse <br />the Contractor or its surety from the obligation of furnishing all the required materials <br />and completing the work in full compliance with the terms of the Contract. <br />1-07.20 Patented Devices, Materials, and Processes <br />Delete the first paragraph of 1-07.20 and substitute the following: <br />The Contractor shall assume all costs arising from the use of patented devices, <br />materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br />defend, and save harmless the City, and its officers, employees and agents from all <br />actions of any nature for, or on account of the use of any patented devices, materials, or <br />processes. <br />1-07.23 Public Convenience and Safety <br />Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br />Nothing contained in this Contract is intended to create any third-party beneficiary rights <br />in favor of the public or any individual utilizing the facilities being constructed or improved <br />under this Contract. <br />1-07.23(1) Construction Under Traffic <br />Revise the third sentence of the second paragraph to read as follows: <br />Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br />may allow activating pedestrian recall timing or other accommodations during <br />construction.
The URL can be used to link to this page
Your browser does not support the video tag.