Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 98 <br />If Engineer determines the permitted closure hours adversely affect traffic, the <br />Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br />in writing of any change in the closure hours. <br />No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br />p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br />as having a holiday fall on Friday, Saturday, Sunday or Monday. <br />Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br />situations as determined by the Engineer. The uniformed officer shall be paid under <br />contract item "Traffic Control – Off-Duty Police Officer.” <br />Contractor shall notify the local Fire, Police and Engineering Departments before <br />the beginning of each phase of construction so that these agencies may re-route <br />their emergency vehicles around the construction zone. The non-emergency phone <br />number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br />Works Engineering is 257-8800. <br />Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br />Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br />to enable rerouting of buses. <br />Contractor shall notify the property owners at least 72 hours in advance to enable <br />them to remove vehicles parked in the vicinity of Work. Towing vehicles shall be <br />the responsibility of the Contractor and no additional payment will be made. <br />Supplement 1-07.23(1)B1 by adding the following: <br />Fencing shall be provided for areas where open trenches or excavations shall be <br />left open during non-working hours. <br />Further supplement 1-07.23(1) by adding the following: <br />1-07.23(1)C General Requirements Traffic <br />(******) <br />The following general requirements apply to all Work on the Project: <br />Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br />10.2(2) TRAFFIC CONTROL PLANS. <br />Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br />construction constraints resulting from traffic control. <br />Notify all affected property owners prior to commencing the barricading of <br />streets, sidewalks and driveways. <br />All business driveways shall remain open except as necessary to permit curing <br />of construction materials or for short periods of time as required for <br />excavations. However, at least one driveway per business shall remain open <br />to vehicular traffic at all times unless otherwise approved by the Engineer and <br />affected property owner in writing. <br />Signs and barricades shall be supplemented by lanterns or flasher units during <br />the hours of darkness. <br />Drivers of motor vehicles used in connection with the construction shall obey <br />traffic rules posted for such location in the same manner and under the same <br />restrictions as provided for the drivers of private vehicles. <br />Conduct the Work, at all time throughout the project, in such a manner as will <br />obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br />Keep the streets, sidewalks and private driveways open except for the brief <br />periods when actual Work is being done.