My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Specialty Equipment Inc. (SEI) dba Neptune General Contractors 4/6/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 3:58:27 PM
Creation date
4/6/2026 3:50:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialty Equipment Inc. (SEI) dba Neptune General Contractors
Approval Date
4/6/2026
Council Approval Date
3/25/2026
End Date
3/25/2027
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Greely Street Water Quality Retrofit Construction
Tracking Number
0005187
Total Compensation
$475,187.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Greely St. Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS January 2026 <br />WO No. UP3817 SP – 98 <br />If Engineer determines the permitted closure hours adversely affect traffic, the <br />Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br />in writing of any change in the closure hours. <br />No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br />p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br />as having a holiday fall on Friday, Saturday, Sunday or Monday. <br />Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br />situations as determined by the Engineer. The uniformed officer shall be paid under <br />contract item "Traffic Control – Off-Duty Police Officer.” <br />Contractor shall notify the local Fire, Police and Engineering Departments before <br />the beginning of each phase of construction so that these agencies may re-route <br />their emergency vehicles around the construction zone. The non-emergency phone <br />number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br />Works Engineering is 257-8800. <br />Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br />Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br />to enable rerouting of buses. <br />Contractor shall notify the property owners at least 72 hours in advance to enable <br />them to remove vehicles parked in the vicinity of Work. Towing vehicles shall be <br />the responsibility of the Contractor and no additional payment will be made. <br />Supplement 1-07.23(1)B1 by adding the following: <br />Fencing shall be provided for areas where open trenches or excavations shall be <br />left open during non-working hours. <br />Further supplement 1-07.23(1) by adding the following: <br />1-07.23(1)C General Requirements Traffic <br />(******) <br />The following general requirements apply to all Work on the Project: <br />Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br />10.2(2) TRAFFIC CONTROL PLANS. <br />Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br />construction constraints resulting from traffic control. <br />Notify all affected property owners prior to commencing the barricading of <br />streets, sidewalks and driveways. <br />All business driveways shall remain open except as necessary to permit curing <br />of construction materials or for short periods of time as required for <br />excavations. However, at least one driveway per business shall remain open <br />to vehicular traffic at all times unless otherwise approved by the Engineer and <br />affected property owner in writing. <br />Signs and barricades shall be supplemented by lanterns or flasher units during <br />the hours of darkness. <br />Drivers of motor vehicles used in connection with the construction shall obey <br />traffic rules posted for such location in the same manner and under the same <br />restrictions as provided for the drivers of private vehicles. <br />Conduct the Work, at all time throughout the project, in such a manner as will <br />obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br />Keep the streets, sidewalks and private driveways open except for the brief <br />periods when actual Work is being done.
The URL can be used to link to this page
Your browser does not support the video tag.