EVERGREEN STATE DEVELOPMENT STANDARD V4.0
<br /> (ESDS V4.0)REQUIREMENTS
<br /> ESDS V4.0 CRITERIA SUMMARY SECTION 4-WATER CONSERVATION SECTION 6-MATERIALS SECTION 7-HEALTHY LIVING ENVIRONMENT
<br /> THE ESDS CRITERIA THAT REQUIRE THE GENERAL CONTRACTOR, 4.01a&4.01b PLUMBING FIXTURES:WHERE THE RENOVATION REPLACES 6.01a HEALTHIER MATERIAL SELECTION:EVIDENCE OF COMPLIANCE 7.02 GARAGE ISOLATION:CONTRACTOR TO SEAL ALL PENETRATIONS uxcE
<br /> SUBCONTRACTORS,OR CONSULTANTS TO COMPLY WITH A PARTICULAR PLUMBING FIXTURES,WATERSENSE LABELED TOILETS,SHOWERHEADS, FOR EACH REGULATED MATERIAL OR PRODUCT WILL BE DOCUMENTED OF THE WALL BETWEEN THE GARAGE AND HOUSE TO ACHIEVE AN of
<br /> CONSTRUCTION PHASE PROCESS ARE AS FOLLOWS: AND BATHROOM FAUCETS SHALL BE INSTALLED WITH THE FOLLOWING IN THE EVERGREEN BINDER(CUT SHEETS WITH COMPLIANCE AIR-TIGHT BARRIER.PROVIDE BEFORE-AND-AFTER PHOTOS AND wr...sac�.xcxnuinxcE com
<br /> SPECIFICATIONS AND DOCUMENTATION REQUIREMENTS: DECLARATION OR PROOF OF APPLICABLE THIRD-PARTY CERTIFICATION). PRODUCT CUT SHEETS.INSTALL GASKETS ON SWING DOOR HEAD AND
<br /> 1.01E INTEGRATIVE DESIGN:DOCUMENTATION JAMB.INSTALL DOOR BOTTOM GASKET TO PREVENTAIR MOVEMENT
<br /> 1.01C INTEGRATIVE DESIGN:CONSTRUCTION MANAGEMENT A. TOILETS(2 POINTS)-1.1 GPF(MAXIMUM GALLONS PER FLUSH)OR PAINT-LOW VOC:(ESDS 6.01a)ALL INTERIOR PAINTS AND PRIMERS MUST UNDER THE DOOR AT THE SILL.PROVIDE PHOTOS AND PRODUCT CUT
<br /> 1.03 BEYOND ADA:UNIVERSAL DESIGN LESS,OR A TOILET WITH DUAL FLUSH,ONE OF THE OPTIONS BEING SHEETS OF THE DOOR GASKETS.
<br /> 3.01 ENVIRONMENTAL REMEDIATION(HAZARDOUS MATERIALS REMEDIATION) LESS THAN 1 GPF,SOOGWATERSENSE LABELED. HAVE BEEN TESTED AND FOUND COMPLIANT WITH THE CALIFORNIA(2010)
<br /> 4.DIAWATER-CONSERVING FIXTURES CA SECTIOT OF N
<br /> 01350,LIC FOR SCHOOL ANDARD
<br /> RESID(CDPHENTIAL
<br /> METHOD EXPOSURE
<br /> (2010),USING PEN7.03 ETRATIONS AGAINSD PEST TIPESGINOTRUSIONENT OUSING AO COMBINR TO ATION OF L ALL PERMIT HAS NOT
<br /> B. LESS,W HEADS(2 POINTS)-1.5 GPM(GALLONS PER MINUTE)OR CA SECTION(COMPLIANCE
<br /> FOR SCHOOL 1.RESIDENTIAL EXPOSURE
<br /> 4.02A ADVANCED WATERCONSERVING FIXTURES LESS,WATERSENSE LABELED. SCENARI05.(COMPLIANCE WITH VI.2(2017)IS ALSO ACCEPTABLE). NON-TOXIC-PROOF SCPRODUCTS,FLASHING,PROVIDE
<br /> BEFORE-AND-AFTER
<br /> BEEN REVIEWED
<br /> CAULK,AND
<br /> 4.02A LEAK DETECTION CORROSION-PROOF SCREENS.INSTALLATION
<br /> OE BEFORE-AND-AFTER PHOTO
<br /> 4.01 B LEAD SERVICE LINES IN EXISTING BUILDINGS C. BATHROOM FAUCETS:1 GPM OR LESS,WATERSENSE LABELED. CERTIFICATION BY ILL GREENGUARD GOLD,OR SCS INDOOR DOCUMENTATION OF THE INSTALLATION OF SCREENS ON OPENINGS
<br /> 5.01B BUILDING DOMESTIC
<br /> WATERHEATING
<br /> EATIN TANDARD-WECIENC ZATION D. KITCHEN FAUCETS(1 POINT):1.75 GPM OR LESS. ADVANTAGE GOLD TEST RE EVIDENCE OF ALSCOMPLIANCE;ABCREDIBLE GREATER CERTIFYING
<br /> AN 1/4 INCH THYARENNDOXIC. RANG CUT SHEETS OF PRODUCTS FOR ACCESSIBILITY
<br /> 5.08BDOMEHEATIN &COOLING EQUIPMENT
<br /> Q IP ENT REPLACEMENT
<br /> LABORATORY TEST REPORTS ARE ALSO ACCEPTABLE. 7.04 LEADZAF THEY NON-TOXIC. AND ASBESTOS
<br /> 609SPACE HEATINGERIAL SELECTION
<br /> NT REPLACEMENT E. ALL FIXTURES FLUSH/FILL
<br /> SPETIFIEDBLOW PRECTIOR
<br /> TO VERIFY FLOW RATE ADHESIVES-LOW VOC:(ESDS 6.01 a)ALL INTERIOR ADHESIVES AND AN IS KNOWN TO CONTAIN
<br /> LEAD-BASED PAINT
<br /> SOMEAS EXTERIOR
<br /> ABATEMENT
<br /> 6.01A HEALTHIER MATERIAL SELECTION AND FLUSH/FILL AS SPECIFIED BELOW PRIOR T PROJECT SEALANTS MUST HAVE VOC CONTENT LESS THAN OR EQUAL TO THE AND IS KNOWN TO CONTAIN LEAD-BASED
<br /> PAINT PAINT ON SOME EXTERIOR
<br /> COMPLETION AND INCLUDE VERIFICATION STATEMENT IN THE TRIM SURFACE AS IN CONTRACTOR
<br /> H PAINT REPORT PROVIDED TO
<br /> AI
<br /> 6.03 CONSTRUCTION WASTE MANAGEMENT EVERGREEN BINDER.SHOWERHEAO AND FAUCETS:GALLONS PER THRESHOLDS PROVIDED BY THE SCAQMD RULE 1168(DATED CONTRACTOR.CONTRACTOR SHALL PROVIDE LEAD-BASED PAINT
<br /> 7.02 GARAGE ISOLATION 101612017). REMOVAL SERVICES BY QUALIFIED PROFESSIONALS.CONTRACTOR(S)
<br /> 7.03 INTEGRATED PEST MANAGEMENT MINUTE WILL BE TESTED WITH THE BUCKET TEST.TOILETS:FLUSHMUST HAVE AT MINIMUM RENOVATION,REPAIR,AND PAINTING(RRP)
<br /> 7.04 LEAD-SAFE WORK PRACTICES VOLUME"STAMP"VERIFIED AND FILL LEVEL CHECKED. LOW/NO FORMALDEHYDE:(ESDS 6.01a)COMPOSITE WOOD. CERTIFICATION AND LEAD-SAFE WORK PRACTICE COMPLIANCE.PROVIDE
<br /> 7.06 EXHAUST FANS-BATHROOM UPGRADE F. CUT SHEETS FOR FIXTURES SHOWING COMPLIANCE WITH STATED FORMALDEHYDE EMISSIONS LESS THAN OR EQUAL TO THE DOCUMENTATION OF CERTIFICATIONS FOR EVERGREEN BINDER.
<br /> 7.07B EXHAUST FANS-KITCHEN UPGRADE STANDARDS IN EVERGREEN BINDER. THRESHOLDS PROVIDED BY CARB PHASE 2 AND/OR TSCA TITLE IV 7.06 EXHAUST FANS-BATHROOM UPGRADE:REMOVE THE EXISTING
<br /> 7.08E VENTILATION UPGRADES F. SUPPLY PRESSURE VERIFIED AND DOCUMENTED TO BE NO MORE FOR PLYWOOD,PARTICLEBOARD,MDF,AND THESE MATERIALS FANS IN EACH BATHROOM.INSTALL ENERGY STAR BATHROOM FANS IN
<br /> 7.09 CLOTHES DRYER EXHAUST THAN 60 PSI(BY GC IN PARTNERSHIP WITH ARCHITECT). WITHIN OTHER PRODUCTS LIKE CABINETS AND DOORS. EACH BATHROOM EQUIPPED WITH A MOTION SENSOR AND
<br /> 7.10 MOLD PREVENTION:SURFACES HUMIDISTAT.PROVIDE CUT SHEETS OF ALL APPLICABLE FANS AND ononpno�
<br /> 7.11 MOLD PREVENTION:TUB&SHOWER ENCLOSURES 4.02a LEAK DETECTION:PRESSURE-LOSS TESTS WILL BE PERFORMED BY HEALTHY FLOORING MATERIALS:(ESDS 6.01a)ALL FLOORING VENTILATION PERFORMANCE TESTING RESULTS.
<br /> PLUMBER,AND GC OR PLUMBER WILL PERFORM VISUAL INSPECTIONS PRODUCTS(WHETHER CARPET OR HARD SURFACE)MUST HAVE BEEN
<br /> 7.12 VAPOR BARRIER STRATEGIES INCLUDING CHECKING FOR LEAKS AT ALL ACCESSIBLE,VISIBLE WATER TESTED AND FOUND COMPLIANT WITH THE CALIFORNIA DEPT OF 7.07B EXHAUST FANS-KITCHEN UPGRADE:THE KITCHEN EXHAUST HOOD
<br /> SUPPLY CONNECTIONS,AND AT VALVES FOR WATER-USING FIXTURES, PUBLIC HEALTH STANDARD(GDPH)METHOD V1.1(2070),USING GA WILL BE ENERGY STAR RATED AND VENTED TO THE EXTERIOR.SEE SHEET
<br /> APPLIANCE,AND EQUIPMENT.ANY LEAKS FOUND WILL BE FIXED BY GC A2.1 CONSTRUCTION NOTE 10.IF REPLACED,INCLUDE CUT SHEETS
<br /> OR THEIR PLUMBER.GC TO PROVIDE RESULTS OF LEAKTEST RESULTS SECTION 013Q,FOR SCHOOL OR RESIDENTIAL EXPOSURE
<br /> IN EVERGREEN BINDER.GC TO PROVIDE BEFORE-AND-AFTER PHOTOS SCENARIOS.(COMPLIANCE WITH V1.2(2017)IS ALSO ACCEPTABLE). INDICATING ENERGY STAR CERTIFIES IN EVERGREEN BINDER.IF INTAKE
<br /> OF LEAKS FOUND AND FIXED IN THE EVERGREEN BINDER.PLUMBING CERTIFICATION By
<br /> CFI-GREEN LABEL PLUS(FOR CARPET AND FOR WHOLE-HOUSE VENTILATION SYSTEM IS LOCATED IN THE KITCHEN
<br /> CONTRACT DOCUMENTS TO INCLUDE LEAK REPAIR WORK IN SCOPE AND CARPET PAD)OR FLOORSCORE(FOR RESILIENT FLOOR)ARE INSTALL A FILTER SYSTEM TO PROTECT THE SYSTEM FROM
<br /> ESTIMATED COSTS(ARCHITECT TO INCLUDE COPIES OF DOCUMENTS IN EVIDENCE OF COMPLIANCE;CREDIBLE LABORATORY TEST REPORTS KITCHEN-GENERATED COMBUSTION PRODUCTS AND PROVIDE PHOTO
<br /> SECTION 1-INTEGRATIVE PROCESS EVERGREEN BINDER). ARE ALSO ACCEPTABLE. DOCUMENTATION OF INSTALLED SYSTEM.
<br /> 4.03a LEAD SERVICE LINES:CONTRACTOR WILL INSPECT THE WATER 7.08B VENTILATION UPGRADES:ALL EXHAUST FANS OTHER THAN
<br /> 1.01b INTEGRATIVE DESIGN:DOCUMENTATION:ALL THE ESDS CRITERIA NO CARPET MAY BE INSTALLED WITHIN 3 FEET OF BUILDING
<br /> THAT REQUIRE THE GENERAL CONTRACTOR,SUBCONTRACTORS,OR SERVICE LINES TO VERIFY THE SERVICE LINES ARE NOT LEAD.INSPECT ENTRYWAYS THATARE ACCESSIBLE FROM THE GROUND,OR IN WET HRWERVS WILL MEET ENERGY STAR.GC TO PROVIDE CUT SHEETS FOR
<br /> AT STREET BOXAND TAKE PICTURE,AND INSPECT AND TAKE PICTURE LOCATIONS SUCH AS LAUNDRY ROOMS,BATHROOMS, EVERGREEN BINDER.PERFORMANCE TESTING OF ALL APPLICABLE FANS
<br /> CONSULTANTS TO COMPLY WITH A PARTICULAR CONSTRUCTION PHASE OF WATER LINE MATERIAL ENTERING THE HOUSE AT THE CRAWL KITCHENS/KITCHENETTES,OR UTILITY ROOMS. WILL BE COMPLETED AND RESULTS RECORDED ON THE WSEC
<br /> PROCESS ARE LISTED IN THE EVERGREEN PROJECT PLAN FORM, SPACE.CONFIRM PRESENCE OR ABSENCE OF AN LSL IN EVERGREEN M18-REQUIRED COMPLIANCE CERTIFICATE AND PROVIDED AS A
<br /> SUMMARIZED ON THIS SHEET,SPECIFICATIONS DIVISION 01 81 13 BINDER AND DOCUMENT WITH THE PHOTOS.IF PRESENT,THE LSL(S)
<br /> SUSTAINABLE DESIGN REQUIREMENTS,AND OTHER DRAWINGS AND WILL BE REMOVED AND REPLACED. INSULATION:(ESDS 6.01a)CAVITY INSULATION,INCLUDING SPRAY SUMMARY REPORT FOR THE EVERGREEN BINDER.PERFORMANCE
<br /> SPECIFICATIONS AS NEEDED TO BE COMPLIANT AND MEET FOAM(FRAMED FLOORS,WALLS,ATTICS,ETC.)MUST HAVE BEEN TESTING WILL BE ARRANGED BY OWNER.GC TO COORDINATE WITH
<br /> CERTIFICATION GOALS.SEE THE EVERGREEN BINDER FOR COPIES OF SECTION 5-ENERGY EFFICIENCY TESTED AND FOUND COMPLIANT WITH THE CALIFORNIA DEPT OF OWNER. PARKVIEW
<br /> APPROPRIATE SECTIONS OF RELEVANT CONTRACT DOCUMENTS. 5.01b BUILDING WEATHERIZATION:CONTRACTOR WILL MAKE PUBLIC HEALTH STANDARD(GDPH)METHOD V1.1(2010),USING CA 7.09 CLOTHES DRYER EXHAUST:THE DRYER WILL VENT TO THE
<br /> IMPROVEMENTS IDENTIFIED IN THE DEEMED MEASURES LIST. SECTION 01350,FOR SCHOOL OR RESIDENTIAL EXPOSURE EXTERIOR THROUGH RIGID METAL DUCTWORK.PROVIDE PHOTO EVE RETT
<br /> 1.01.INTEGRATIVE DESIGN:CONSTRUCTION MANAGEMENT:THE EVERGREEN BINDER TO INCLUDE COMPLETED DEEMED MEASURES LIST SCENARIOS.(COMPLIANCE WITH V1.2(2017)IS ALSO ACCEPTABLE). DOCUMENTATION OF THE INSTALLATION FOR THE EVERGREEN BINDER. INTERIOR
<br /> CONSTRUCTION TEAM EDUCATION PLAN IS REFERENCED IN THE AND CUT SHEETS FOR ALL INSTALLED MATERIALS. CERTIFICATION BY ILL GREENGUARD GOLD,OR SCS INDOOR
<br /> SPECIFICATIONS SECTION 01 81 13 SUSTAINABLE DESIGN ADVANTAGE GOLD ARE EVIDENCE OF COMPLIANCE;CREDIBLE 7.10 MOLD PREVENTION:SURFACES:CONTRACTOR TO PROVIDE REMODEL
<br /> REQUIREMENTS.EVERGREEN BINDER TO INCLUDE FINALIZED TESTING DEEMED MEASURES LIST: LABORATORY TEST RE PORTS ARE ALSO ACCEPTABLE. DURABLE,CLEANABLE SURFACES THROUGHOUT BATHROOMS,
<br /> AND VERIFICATION SCHEDULES AND COPIES OF ESDS PROGRESS IF TWO-PART SPRAY POLYURETHANE FOAM INSULATION IS TO BE 1. ATTIC INSULATION:UPGRADE THE ATTIC INSULATION TO R49 OR TO KITCHEN,AND LAUNDRY ROOM.PROVIDE CUT SHEETS OF WALL,
<br /> REPORT-OUT MEETING AGENDAS PROVIDED BY ARCHITECT/ESDS LEAD. THE MAXIMUM INSULATION LEVEL ALLOWED BY THE HEIGHT OF FLOOR,AND CEILING FINISHES AND COUNTERTOPS AND SINKS WITH 302-76TH PL.SW
<br /> ATTIC SPACE WHILE LEAVING CLEARANCE FOR VENTILATION. USED,BOTH OF THE FOLLOWING APPLY: IDENTIFIED COMPLIANCE(HIGHLIGHT OR MARK CUT SHEETS). E302-75,WA.SW
<br /> 1A3 BEYOND ADA:UNIVERSAL DESIGN:OPTION 84-32INCH CLEAR 2. EXTERIOR WALL INSULATION:INSTALL DENSE PACK INSULATION TO 1, HFC BLOWING AGENTS MUST NOT BE USED(PROHIBITED IN 7.11 MOLD PREVENTION:TUB&SHOWER ENCLOSURES:THE ROLL-IN
<br /> DOORS,LEVER HANDLE,ROLL-IN SHOWER AND NAVIGABLE CONTROLS FILL THE WALL CAVITY WHEREVER OPENED/EXPOSED. WA AS OF JAN 1,M21 BY CHAPTER 70A.45.080 RCW). BATHROOM SHOWER WILL BE A MULTI-PIECE FIBERGLASS ENCLOSURE
<br /> 3. FILLTHELOG CRAWL SPACE VIT INSULATION: PENSILL /EXPOSST TY TO R-30.
<br /> WILL BE CREATED/INSTALLED. 4. EXHAUST DUCT INSULATION:THE EXHAUST DUCTING WILL BE 2. THE CONSTRUCTION MANAGEMENT PLAN(SEE CRITERION OVER CONCRETE BACKER-BOARD AND SEAMS/PENETRATIONS SEALED
<br /> SEALED AND INSULATED. 1.01c)MUST COVER ALL APPROPRIATE OSHA APPROVED WITH LIQUID APPLIED ELASTOME RIC.PROVIDE CUT SH EETS WITH CONSTRUCTION
<br /> SECTION 3-SITE IMPROVEMENTS 5. HOT WATER DISTRIBUTION PIPE:WHEN EXPOSED,INSULATE TO
<br /> CODE R403.5.3 WHICH IS R-3. SAFETY AND HEALTH MEASURE RELATED TO INSTALLATION- IDENTIFIED OMPLIANCE INSTALLED BA KERB A D AND ARK CUT
<br /> SEAMS.
<br /> PROVIDE SET
<br /> 3.01 ENVIRONMENTAL REMEDIATION:THE PHASE I ESA WAS SUBMITTED 6. ENERGY AUDIT AIR LEAKAGE BASELINE: INCLUDING RESPIRATORS,PPE,AND WORKAREA CONTROLS. PHOTOS OF INSTALLED BACKER-BOARD AND SEALED SEAMS.
<br /> WITH THE APPLICATION.LEAD-BASED PAINT,ASBESTOS AND MOLD PRIOR TO CONSTRUCTION:COORDINATE WITH OWNER TO CONDUCT 7.12 VAPOR BARRIER STRATEGIES:THE REQUIREMENTS OF THIS
<br /> SURVEYS OF THE PROPERTY WERE ALSO PERFORMED AND THE BLOWER TEST OF THE HOUSE,EXCLUDING GARAGE.USE A TEST SECTION WILL BE IMPLEMENTED.8-MIL MINIMUM THICKNESS "
<br /> PRESSURE OF 50 PA. CROSS-LAMINATED POLYETHYLENE WILL BE INSTALLED ON
<br /> RESULTS SUBMITTED WITH THE APPLICATION.THE PHASE I ESA AFTER CONSTRUCTION:COORDINATE WITH OWNER TO REPEAT THE 6.03 CONSTRUCTION WASTE MANAGEMENT:CONTRACTOR TO PROVIDE A
<br /> DETERMINED NO REC.WERE PRESENT.THE LEAD-BASED PAINT BLOWER TEST.COMPARE WITH THE PRECONSTRUCTION TEST TO CONSTRUCTION WASTE MANAGEMENT PLAN USING METHOD 81 THAT DIVERTS CRAWL-SPA GE FLOORS.IN ADDITION:
<br /> SURVEY INDICATED THE PRESENCE OF LEAD-BASED PAINT ON SOME SHOW IMPROVEMENT. 75%OR MORE OF THE CONSTRUCTION WASTE FROM THE LANDFILL.THE THE POLY WILL BE EXTENDED AT LEAST 12INCHES UPON PIERS PARKVI EW
<br /> EXTERIOR TRIM COMPONENTS.THE ASBESTOS SURVEY IDENTIFIED ACM 7. RECESSED CANS:USE IC RATED AIR-TIGHT CANS OR J-BOX AND APPROVED CONTRACTOR SUBMITTAL OF THE CONSTRUCTION WASTE PLAN WILL AND FOUNDATION WALLS.FOUNDATION VENTS WILL BE CUT
<br /> IN DRYWALL TEXTURE THROUGH-OUT THE PROPERTY WHICH WILL BE AIR-SEALED SURFACE MOUNTED LED. BE AVAILABLE ON THE JOB SITE DETAILING HOW REUSABLE/RECYCLABLE AROUND. SERVICES
<br /> 8. REPLACE HEATING/COOLING SYSTEMS:HEAT PUMP HVAC IS BEING MATERIALS ARE REDIRECTED FROM THE LANDFILL.ARCHITECT WILL INCLUDE
<br /> PR VIDE
<br /> ASBESTOS
<br /> COMPONENT A TERVICE B. CONTRACTOR SHALL • JOINTSIN THE POLY WILL OVERLAP AT LEAST 12 INCHES.
<br /> INSTALLED. COPY OF THE APPROVED PLAN INTHE EVERGREEN BINDER.AI WILL ENSURE
<br /> PROVIDE ASBESTOS REMOVAL SERVICES BY A QUALIFIED ABATEMENT 9. COMMISSION THE HVAC,EXHAUST FANS,AND ERV SYSTEMS. THAT • NO"HIGH-TRAFFIC"AREAS OF THE CRAWL SPACE,SO NO FOAM 4720200TH ST SW,STE 200
<br /> SUBCONTRACTOR. BSITE N RECEIPTS(RECYCLE COPIES
<br /> ES OFA ALL
<br /> WASTE R BE RECEIPTS
<br /> FOR
<br /> THE THE BOARD IS NEEDED TO PROTECT THE POLY. LYNNWOOD,WA MD36
<br /> JOB SITE ENG ALSO PROVIDE COPIES OF ALL WASTE RECEIPTS FOR THE
<br /> S.OBb DOMESTIC WATER HEATING-HIGHER EFFICIENCY:GCS PLUMBER IS EVERGREEN BINDER. FOR THE EVERGREEN BINDER:1.GC TO PROVIDE CUT SHEETS WITH
<br /> TO DESIGN AND INSTALL AN ENERGY STAR ELECTRIC HEAT PUMP WATER IDENTIFIED COMPLIANCE(HIGHLIGHT OR MARK CUT SHEET).2.GC TO
<br /> HEATER.PLUMBER TO DETERMINE SIZE AND ASSOCIATED UNIFORM PROVIDE PHOTO DOCUMENTATION DISPLAYING INSTALLATION a.opa xoiraer 20026
<br /> ENERGY FACTOR.GC TO HAVE THE PLUMBER PROVIDE THE COMPLYING WITH THE REQUIREMENTS. 2111/2025
<br /> CALCULATIONS(INCLUDING SIZE AND ASSOCIATED UNIFORM ENERGY we am
<br /> FACTOR)AND PROVIDE SPEC SHEETS TO DOCUMENT COMPLIANCE Pf°w"`"`"`e`r VT
<br /> I N FORMATION FOR TH E EVERGREEN BINGE R. vmiedacn'ied LAS
<br /> 6.09 SPACE HEATING&COOLING EQUIPMENT REPLACEMENT:GC'S a.opd oedeee� LAS
<br /> HVAC SUB IS TO DESIGN AND INSTALL HIGH EFFICIENCY ENERGY STAR LAS.GE
<br /> RATED HEAT-PUMP.ALL IN-UNIT DUCTS FOR CONDITIONED AIR xea ey VT
<br /> DISTRIBUTION MUST BE MECHANICALLY FASTENED,SEALED WITH emit
<br /> MASTIC,ANDINSULATED. HVAC SUB TO DETERMINE SIZE AND TO ESDS V4.0
<br /> PROVIDE WSEC FORMS,CALCULATIONS DEMONSTRATING SYSTEM
<br /> MEETS AND ALIGNS WITH LOAD REQUIREMENTS,AND CUT SHEETS ON REQUIREMENTS
<br /> ALL EQUIPMENT.CALCULATIONS WALL BE COMPLETED AND RESULTS
<br /> RECORDED ON THE WSEC 2018.REQUIRED COMPLIANCE CERTIFICATE
<br /> AND PROVIDED AS ASUMMARY REPORT FOR THE EVERGREEN BINDER. ` City of Everett Permit Services
<br /> GC TO PROVIDE ALL DOCUMENTATION FROM HVAC SUB FOR THE EVERETT Reviewed for Permit it ServiCe AOe2
<br /> EVERGREEN BINDER(WSEC FORMS,CALCULATIONS,REPORTS,CUT ..r..er•.
<br /> SHEETS).
<br />
|