Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />15 <br /> <br />• RFIs received beyond the estimated amount may require an increase to the anticipated level <br />of effort. <br />• Number of RFIs and hours is an estimate and may not reflect actual number of RFIs or time <br />required for RFI review. RFI metrics will be reviewed monthly and included in the monthly <br />progress report. <br />• RFI responses will be noted and tracked on Contractor’s redline record drawings and not <br />through reissuance of Contract drawings. <br />Meetings <br />• Allowance of up to 40, 1-hour ad-hoc meetings/correspondence related to RFI issues <br />resolution and response. <br />Work Products <br />• RFI responses. <br />Task 1022.5 Bluebeam Session Management <br />BC will maintain a set of conformed Contract Documents in a Bluebeam Studio Session reflecting <br />design and field changes that are accessible to the Design Team, City and City’s CM for the duration <br />of the project. The Bid Documents are the official documents; the Conformed Documents are for the <br />convenience of the contractor. <br />The conformed documents shall be updated by BC on a monthly basis to reflect recent approved <br />submittals, Change Orders (COs) and RFIs as well as other field changes not captured in an RFI or <br />CO. <br />The marked up conformed documents will be the basis for subsequent CO and RFI responses. <br />The City and the City’s CM are responsible for updating the redline as-built documents that reflect <br />changes made in the field and providing updates monthly, prior to the Bluebeam updates. Bluebeam <br />updates will be based on final and official documents provided to the BC team by the City. <br />Drawings: <br />In general, markups in Conformed Drawings shall be done in the following manner and include the <br />following information: <br />• Add notes on drawings with appropriate reference numbers to RFIs, Change Orders, Field <br />Directives, or other approved changes. <br />• Maintain/Update Drawing Revision Blocks <br />• Markups should indicate general area affected and give brief description of the issue. <br />• Use revision clouds and create linework where needed to help identify area and change. <br />Specifications: <br />In general, markups in conformed specifications shall be done in the following manner and include <br />the following information: <br />• Add notes on specifications with appropriate reference numbers to Submittals, RFIs, Change <br />Orders, or Field Directives. <br />• Markups should indicate equipment and/or spec requirements affected. <br />o Indicate submitted manufacturer/model under “Acceptable Manufacturers” by yellow <br />highlight in spec or add notes summarizing where a substitution was accepted