My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />16 <br /> <br />• Use revision clouds where needed to help identify items and specific change/revision in <br />Bluebeam. <br />Activities/Approach: <br />• Coordinate with the City and the City’s CM regarding City staff and City’s CM staff <br />permissions for Bluebeam access. <br />• Conformed Documents will be reviewed monthly during meeting between Design Team and <br />City Staff. It is estimated that updates will be made weekly for 13 months at four hours per <br />week (224 total hours). The final documents will be transferred to the City at the end of the <br />project. <br />• Two training sessions on how to review documents in the Bluebeam Session (Bluebeam <br />2020 or newer) will be provided to City and City’s CM staff. BC will establish a common user <br />Profile with Tool Chest of Tool Sets within the Bluebeam Session. Training will include <br />identification of the workflow process with steps of how to complete the process. <br />Deliverables: <br />• Workflow diagram for submitting comments and mark-ups to drawings and specifications. <br />• Two training sessions for City and City’s CM staff to confirm access to the Bluebeam Session <br />and review workflow(s). <br />• Electronic copy of final PDF documents at Substantial Completion. <br />Phase 1023 – Package 1 Construction Change Support <br />Objective: Provide technical review of Change Order Proposals (COPs), Work Change Directives <br />(WCDs), Change Order Requests (CORs), and Field Orders (FOs), and provide recommendations for <br />action in response to COPs and CORs. Coordinate and prepare change documentation with <br />adherence to contract change procedures. <br />Activities/Approach: This task includes the following activities: <br />• Prepare and/or review Change Order Proposals and Work Change Directives (by <br />City/Engineer) and Change Order Requests (by the Contractor), screening for completeness, <br />distributing to the appropriate reviewers, and returning review comments to the initiator of <br />the change proposal or directive. <br />• Review comments and recommendations will be provided within 14 working days after <br />receipt. If a review requires more time, the City will be notified. <br />• Design document revisions will be provided in a mutually agreed upon timeframe and format <br />based on the complexity of the revisions and the need for coordination between BC, the <br />Contractor, the City, and/or vendors. <br />• Assist City’s CM with research, design clarification and design changes transmitted to the <br />Contractor through Field Orders. Field Orders are written orders issued by the Owner’s <br />Representative that requires minor changes in the Work, but do not involve a change in the <br />Contract Sum or the Contract Time. It is presumed that force account allowances and unit <br />bid items falling under the Total Contract Sum will fall under Field Order authorizations. <br />• Coordinate with Discipline Engineering staff for design services where required. <br />Assumptions <br />• City’s CM will administer and manage Change Documentation, including processing change <br />orders and field orders, changed work tracking, distributing change documentation, and <br />maintaining change logs.
The URL can be used to link to this page
Your browser does not support the video tag.