Laserfiche WebLink
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />21 <br /> <br />Provide support to the City in procedures required to finalize project components and document <br />completion for City records. <br />Task 1025.1 Completion Activities <br />Objective: To assist with project closeout procedures, prepare construction completion <br />documentation. Activities under this task generally extend from 60 days prior to substantial <br />completion to engineering services project closeout. <br />Activities/Approach: This task includes the following activities: <br />• Complete discipline engineering walkthroughs to develop corrective work items (punch list <br />items) to supplement those items already noted by the City’s CM. <br />o Discuss corrective work items completion and contribute to decision to sign-off <br />corrective work items with City’s CM. <br />Assumptions: <br />• City’s CM will create, manage, and track Corrective Work Items List <br />• City’s will transmit documentation from the construction record not already in BC’s <br />possession for preparation of the Construction Completion Report. <br />• The City will host final walkthroughs for the purpose of corrective work items assessment. <br />• The City will track Corrective Work Items List, including signing off completed items. <br />• The City will complete warranty items lists and track warranty items completion. <br />• The City will contribute IDRs and progress meeting minutes to Construction Completion <br />Report <br />• The City will complete letters of substantial and final completion. <br />• BC will not provide warranty period services under this Amendment. <br />Meetings: <br />• On-site corrective work walkthroughs by engineering disciplines. <br />Deliverables: <br />• Discipline items to include in Corrective Work Items Lists – all disciplines. <br />• Construction Completion Report (electronic deliverable transferred through OneDrive). <br />Task 1025.2 Record Documents <br />BC will produce record drawings using vendor submittal and as-built information provided by the <br />Contractor. <br />Activities/Approach: <br />• Final record drawings will start from markups in Bluebeam session and will incorporate <br />redlines provided by the Contractor and limited field confirmation of record conditions <br />(assumed 30 hours of field review time and 60 hours of office engineering support). The <br />Contractor will maintain responsibility for the accuracy of redlines in conveying the as-built <br />conditions. <br />• For budgeting purposes, 40 sheets are assumed to require revisions for the final record set <br />and each sheet is assumed to require 8 hours of CAD effort for revisions (320 hours). Effort <br />includes updating the title block for all sheets. <br />• Record drawings will not be signed or sealed.