My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />24 <br /> <br />BC will perform site visits at the construction site at a frequency commensurate with construction <br />progress to remain informed and engaged with construction progress and to facilitate RFI responses, <br />submittal reviews, or resolve engineering and permit issues. <br />Activities/Approach: <br />• Prepare for and participate in team meetings with the City PR and other City staff. Site visit <br />meetings will be held at a frequency commensurate with construction progress and on an as <br />needed basis to discuss topics needing a field visit. There will be an estimated total of 40, 2- <br />hour-long site visit meetings, attended by an engineering staff member. Travel time of one <br />and a half hours and one hour of prep and one hour of follow-up coordination is included in <br />the estimate. Submit agenda items for inclusion in the City-prepared agenda at least 3 days <br />prior to the meeting date. An estimated 50 hours of informal consultation will be provided <br />for City questions and requests for information not related to a Contractor RFI. <br />• BC will inform the City PR if a site visit is required. <br />• Create a site observation form. <br />• Attend Contractor safety training as requested by the Contractor and City PR. <br />Assumptions: <br />• The City or City’s CM will schedule and organize the site visits as needed. The City or City’s <br />CM will inform the Contractor of the visit. <br />• The City or City’s CM will provide site access during normal working hours when requested, <br />including prior to and after contractor mobilization to the site. <br />• BC will be provided access to the construction site without requiring advanced notice. <br />• BC will adhere to the Contractor safety requirements in addition to their own Site-Specific <br />HASP. <br />• Ad-hoc field visits will be scheduled on an as-needed basis and will not exceed 8 visits with 2 <br />BC staff each visit. <br />Deliverables: <br />• Field memoranda documenting engineer field visits and meetings attendance notes (for <br />Engineer called meetings) <br /> <br />Phase 1052 – Package 2 Engineering Services During Construction <br />Task 1052.1 Conformed Documents <br />Objective: Prepare conformed drawings and specifications that reflect issued addenda. <br />The bid documents and written addenda are the official contract record. Conformed drawings are <br />issued solely for the convenience of the contractor and the larger construction. No new engineering <br />or design will be performed in the preparation of conformed drawings and specifications. Only <br />changes already issued as addenda will be made to the contract documents. <br />Activities/Approach <br />• Remove signatures and add disclaimer to all drawings and front matter of specifications. <br />• Incorporate addenda into drawings and specifications. Up to 150 addenda drawings and 30 <br />addenda specifications will be modified to complete conformed document set, with an average <br />effort of 1 hours per drawing and 1 hours per specification.
The URL can be used to link to this page
Your browser does not support the video tag.