My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:37 PM
Creation date
4/13/2026 3:26:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
4/11/2026
Council Approval Date
4/8/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003935
Total Compensation
$3,783,388.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 9/20/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer - Exhibit A Scope of Work <br /> <br />2 <br /> <br />Amendment 1 Budget Augmented Phases and New Phases <br />Phase 1025 Package 1 Close-out Period Services <br />Phase 1026 Package 1 Unanticipated Services <br />Phase 1051 Package 2 Project Meetings <br />Phase 1052 Package 2 Engineering Services During Construction <br />Phase 1053 Package 2 Construction Change Support <br />Phase 1054 Package 2 Specialty Services <br />Phase 1025 Package 2 Close-out Period Services <br />Phase 1026 Package 2 Unanticipated Services <br />Exhibit B – Budget provides additional work breakdown into additional subphases and tasks for <br />project tracking and control. <br />Scope Descriptions <br />The phase descriptions below include an objective statement, activities/approach, task <br />assumptions, and work products that designate which service or item will be provided by the BC <br />team. City staff activities required to complete tasks are noted where applicable. <br />Scope assumptions applicable to the overall Project are described below. <br />Project-level Assumptions <br />• All deliverables will be delivered in electronic formats, with no printed copies. Bid documents <br />will be digitally signed and sealed. City, Contractors, and City’s CM firms shall be responsible <br />for hard copy reproduction of bidding and construction documents. BC will be responsible <br />for hard copy reproductions for their own purposes. <br />• Engineer, where used herein, shall mean BC and its subconsultants. <br />• Unless otherwise specified, meetings and workshops will be held virtually. <br />• Construction period services begin with bid opening and conclude with final acceptance of <br />the work by the City. <br />• Services during contractor’s general warranty/guarantee period are not included. <br />• City PM will provide timely, consolidated staff review comments on draft work products. City <br />review periods will be identified in project schedules. <br />• Owner’s Representatives include BC, its subconsultants, City staff, and City’s CM firm that <br />represent Owner’s interests in the Construction Contract that are employed or retained by <br />the Owner. <br />• Mileage for in person meetings and site visits are budgeted assuming the visits are to the <br />Port Gardner site. <br />• Meeting agendas and notes will be prepared by BC unless otherwise stated. <br />• Labor and expense effort is inflated at 5% per annum for work taking place after 2026. <br />• Work extent and sequence: The scope of work and budget allocation to each phase and task <br />is based on a number of assumptions regarding how the work is envisioned to proceed. <br />Given the nature of services during construction, the actual level of effort required for each <br />phase/task may require reallocation of funds from one phase/task to another. <br />• The scope and budget do not include effort for preparing submittals for the City’s insurer or <br />responding to review comments that may result from the City’s insurer review.
The URL can be used to link to this page
Your browser does not support the video tag.