Laserfiche WebLink
KBA, Inc. December 23, 2025 <br />S:\Projects\Contracts\Client\Everett\BP2512801_WMVD Storm+Combined Sewer CM\Negotiations\Prime_KBA_Negotiations\Scope KBA_WMVD_Rev1.docx 1 of 7 <br /> <br />EXHIBIT A <br />SCOPE OF SERVICES <br />for <br />PGSF WMVD Storm and Combined Sewer Package 2 <br /> <br /> <br />KBA, Inc. (Consultant) will provide Construction Management (CM) services to City of Everett (Client) for <br />the project known as PGSF WMVD Storm and Combined Sewer Package 2 (Project). These services <br />will include consultation, contract administration, field observation, documentation, and material testing, <br />as required during the construction of the Project, as detailed below. <br /> <br />Project Description: <br />The City of Everett (City) Port Gardner Water Quality Program serves to improve water quality in <br />Possession Sound and Port Gardner Bay by reducing combined sewer overflows (CSOs) and providing <br />regional stormwater treatment for more than 200 acres of urban watershed. This program includes the <br />construction of the Port Gardner Storage Facility (PGSF) and the associated West Marine View Drive <br />WMVD conveyance infrastructure (PGSF WMVD Storm and Combined Sewer). PGSF WMVD Storm and <br />Combined Sewer is split into two discrete projects, referred to as Packages 1 and 2. The PGSF WMVD <br />WMVD Storm and Combined Sewer Package 2 consists of construction of various diameter pipelines and <br />structures to convey wastewater and stormwater to the Port Gardner Storage Facility from multiple <br />locations north and south of the PGSF. The PGSF and PGSF WMVD Storm and Combined Sewer <br />projects are scheduled to be operational by December 31, 2027. The Designer of Record on this Project <br />is Brown and Caldwell (Designer). <br /> <br /> <br />I. CONSTRUCTION MANAGEMENT SERVICES <br /> <br />A. Consultant Contract and Team Management: Provide overall day-to-day management of the <br />Consultant contract and Team, including: <br /> <br />1. Decide on best modes and frequency of communication with Client and Designer. Liaison <br />and coordinate with Client on a regular basis to discuss Project issues and status. <br /> <br />2. Manage Consultant Team, comprised of Consultant’s staff and its subconsultants, if any. <br />Organize and layout work for Consultant Team. <br /> <br />3. Review monthly expenditures and Consultant Team scope activities. Prepare and submit to <br />Client monthly, an invoice and progress report describing services provided that period. <br />Prepare and submit reporting required by funding source(s), if any. <br /> <br /> <br />Deliverables <br />• Monthly invoices and progress reports <br />• Reporting required by funding source(s ), if any <br /> <br /> <br />B. Preconstruction Services <br />1. Review Contract Documents to familiarize team with Project requirements. <br />2. During Bidding period: <br />a. Lead Pre-Bid meeting(s). <br />b. Assist in analyzing bidder questions, as needed. <br />c. Assist Designer in researching and preparing Addenda, as needed.