My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Audio Engineers Northwest 4/20/2026
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Audio Engineers Northwest 4/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 10:07:49 AM
Creation date
4/21/2026 10:06:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Audio Engineers Northwest
Approval Date
4/20/2026
End Date
12/21/2026
Department
Finance
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
AUDIO VISUAL SERVICES FWC 26 FAN ZONE WATCH PARTY
Tracking Number
0005219
Total Compensation
$198,322.00
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Audio (2) Rigging Overview <br />1) Total PA system load per side is under 600 lbs2) We have specified a modern, light wight high-performance system for this event. A typical PA for an outdoor concert ofthis scale would weigh greater than 2,000 lbs per side.3) No heavy equipment needed for moving this system <br />Minimum safety factor of system is 7:1 (5:1 is minimum requirement)
The URL can be used to link to this page
Your browser does not support the video tag.