My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:32:36 PM
Creation date
4/21/2026 1:25:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 1
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 22 13 - 3 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 22 13 - 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />1.3 PROCEDURE <br />A. Requests for Criteria Modification. <br />1. A Bidder may request that City modify the supplemental bidder responsibility <br />criteria listed above. This request must be in writing to the City project manager <br />and must be received by the City project manager at least ten business days <br />before the bid opening. The City project manager will evaluate the information <br />submitted by the Bidder and will respond within three business days after receipt <br />of the request. If City evaluation results in a change of the criteria, the City will <br />issue an addendum to the bid documents identifying the new or revised criteria. <br />Any protest of a City decision regarding a request for criteria modification must <br />be in strict conformity with Everett Municipal Code Chapter 3.46, Bid Protest <br />Procedures. <br />B. Additional Information. <br />1. The City may require that the Bidder submit information in addition to the <br />Bidder’s Supplemental Responsibility Statement. The City may require <br />supplementation or revision of the Bidder’s Supplemental Responsibility <br />Statement. The City also reserves the right to obtain information from third <br />parties and independent sources of information concerning a Bidder’s <br />compliance with the mandatory and supplemental criteria, and to use that <br />information in their evaluation. The City may consider mitigating factors in <br />determining whether the Bidder complies with the requirements of the <br />Supplemental Criteria. <br />C. Appeal of Responsibility Decision. <br />1. If City staff recommends that the Bidder be found to not meet the bidder <br />responsibility criteria above and is therefore not a responsible bidder, City staff <br />will notify the Bidder in writing with the reasons for recommendation. If the Bidder <br />disagrees with this recommendation, the Bidder may appeal to the director of the <br />City department responsible for this Contract (the “Director”) by presenting <br />additional information to the Director in writing within two (2) business days after <br />receipt of the recommendation. The Director will consider the appeal and any <br />additional information and will issue a decision regarding the appeal. Any protest <br />by Bidder of the Director decision or any award must be in strict conformity to <br />Everett Municipal Code Chapter 3.46, Bid Protest Procedures, which (among <br />other requirements) may require that any protest be filed with the City Clerk no <br />later than the business day prior to the date of City Council proposed award or <br />rejection of all bids. The City will not execute a contract with any other Bidder <br />until two business days after the Bidder determined to be not responsible has <br />received the Director decision or, if a protest is filed under Everett Municipal <br />Code Chapter 3.46, until two business days after the Bidder receives written <br />notice of the City’s final determination of the protest.. <br />PART 2 - PRODUCTS (NOT USED) <br />PART 3 - EXECUTION (NOT USED) <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.