Laserfiche WebLink
City of Everett 00 25 13 - 1 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 25 13 - 1 PRE-BID MEETING <br />SECTION 00 25 13 <br />PRE-BID MEETING <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Two pre-bid meetings will be held to discuss the project. Attendance of at least <br />one of the pre-bid meetings is mandatory for all prospective bidders. At this <br />meeting the items on the Agenda will be covered (see 1.5 AGENDA). The <br />meeting will also include a site walk. <br />B. Each Bidder must sign the sign-in sheet at the meeting. <br />C. Attendance at a pre-bid meeting is one of the supplemental responsibility criteria <br />under Supplemental Instructions to Bidders (Section 00 45 13). A Bid received <br />from a Bidder who did not attend one pre-bid meeting and sign the sign-in sheet <br />will be found not responsible and the bid will be rejected. <br />1.2 DATE <br />A. Meeting 1 - 10:00 AM, TUESDAY, JANUARY 20, 2026 <br />B. Meeting 2 - 2:00 PM, THURSDAY, JANUARY 22, 2026 <br />1.3 LOCATION <br />A. The meeting place will be at the Grand Avenue Park Bridge and West Marine <br />View Drive at 1520 W Marine View Dr, Everett, WA 98201. <br />1.4 TIME <br />A. On JANUARY 20, 2026, the meeting/site visit will start promptly at 10:00 AM. <br />B. On JANUARY 22, 2026, the meeting/site visit will start promptly at 2:00 PM. <br />1.5 AGENDA <br />A. Review Scope of Project <br />B. Review required documents to be submitted with the Bid Form