My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Injection Grouting <br />Project No. 180162 03 64 00 - 6 <br /> <br />D. The Contractor shall employ an expanded gasket to control in flowing water in larger <br />cracks, joints, or pipe to manhole boots by soaking dry Oil Free Oakum Avanti (AV-219 <br />Fibrotite) or equal with (AV-202) Multigrout or equal and forcing the Oakum/Resin plug <br />into opening until it sets. See: Avanti EGP Manual for details. <br />2.06 ANNULAR SPACE GROUT <br />A. Provide Low Density Cellular Concrete (LDCC) for grouting of annular spaces where <br />specified, <br />1. ELASTIZELL PS, or approved equal. <br />2. LDCC shall be Portland cement in accordance with ASTM C150, C595 or C1157, <br />water and preformed foam in accordance with ASTM C869 when tested in <br />accordance with ASTM C796. LDCC shall: <br />a. Include fine aggregate, pozzolans and other cementitious materials and <br />admixtures. Admixtures shall be approved by the foam manufacturer. <br />b. Have a compressive strength of 50 to 300 psi. <br />c. Have a density of 20- to 120 pcf. <br />d. Mix designs as recommended by the Contractor for the installation shall be <br />submitted for reviewed and accepted <br />3. LDCC shall not be used for pipe zone or trench backfill. <br />B. Grouting of the annular space shall be done in such a manner as to prevent damage or <br />collapse of the Liner pipe. Grouting pressures shall not exceed the pipe manufacturer’s <br />recommendations. <br />C. Control groundwater and wastewater flows during grouting and groundwater or <br />wastewater present shall be removed from the annular space before injecting the grout. <br />PART 3 EXECUTION <br />3.01 PREPARATION <br />A. All material shall be clearly dated by the manufacturer. Owner or Construction Manager <br />shall be provided the opportunity to inspect the Contractor’s storage facilities at any time. <br />Any material found to have exceeded its shelf life or found to be stored under improper <br />temperature and humidity conditions, as determined by manufacturer’s <br />recommendation, shall be marked rejected, shall not be used, and shall be removed <br />from the site immediately. <br />B. Mix and handle the grout and the constituents producing it, which may be toxic on <br />contact or inhalation, as recommended by the manufacturer and to minimize hazard to <br />personnel. Provide appropriate protective measures to ensure that the grout components <br />and the chemicals produced in mixing are under the control of the Contractor at all times <br />and are not available to unauthorized personnel or others. Dispose of excess grout <br />resulting from sewer grouting operations in a safe manner. All equipment and material <br />shall be subject to the review of Owner and Construction Manager.
The URL can be used to link to this page
Your browser does not support the video tag.