My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Injection Grouting <br />Project No. 180162 03 64 00 - 5 <br /> <br />2.04 EQUIPMENT <br />A. Grouting equipment shall consist of two separate pumping systems capable of supplying <br />an uninterrupted flow of sealing materials to fill the voids completely. The gel side of the <br />system shall be a closed system to minimize exposure to moisture. Pumps, fittings, and <br />hoses shall be designed to transport a high viscosity material and shall not be affected <br />by acetone or ketone solvents. The sizing of the system shall be such that the water side <br />can transport materials at 1 to 1 or 8 to 10 times the ratio of the gel side. Pumps shall <br />be sized to deliver a minimum of 3 gpm. <br />B. Grout shall pass from the pumping system through instant reading, controlled flow <br />meters and then through a dual hose system into the sealing device. The device (referred <br />to hereafter as a packer) shall be a cylindrical case of a size less than pipe size, with the <br />cables at either end used to pull it through the line. The packer device shall be <br />constructed in such a manner as to allow a restricted amount of sewage to flow at all <br />times. <br />C. Air impervious inflatable sleeves shall be mounted over the cylinder with the ends of the <br />sleeve sealed to the ends of the casing. The sleeves shall be so constructed that they <br />can be pneumatically expanded from the center to both ends. The center portion of the <br />sleeve shall be sealed to the casing by a broad confining band. When the packer is <br />inflated, two widely spaced annular bladders shall be formed, each having an elongated <br />shape and producing an annular void around the confined portion of the sleeve. The <br />packer (between the ends) shall be expandable in order to reduce the amount of wasted <br />grout in the void area. No sealing device which is expanded mechanically nor where the <br />expansion sleeve is not continuous will be allowed in order to prevent damage to the pipe <br />from excessive amounts of sealing pressures or air leakage in the center area of such <br />sealing device. Only low void packers with annular space less than ¼ gallon shall be <br />used. <br />D. Tap and lateral service sealing shall be accomplished with a lateral packer. The objective <br />of the lateral service packer is to seal the tap connection to the main sewer and a portion <br />of the lateral service. The lateral sealing tube shall be designed to accommodate 4-inch <br />and 6-inch diameter laterals and laterals with a transition diameter. Sealing of lateral tap <br />connections directly connected to the mainline sewer shall be completed using an 8-foot- <br />long sleeve. Sealing of lateral pipe joints for laterals connected to manholes shall be for <br />the first 20 feet, as measured from the manhole wall to the pipe transition or to the <br />cleanout, whichever comes first. <br />2.05 MANHOLE/STRUCTURE JOINT SEALING GROUT <br />A. Rapid setting cement to eliminate infiltration shall be Quadex Quad-Plug or approved <br />equal. <br />B. Fill any large voids with patching mix such as Quadex Hyperform or approved equal. <br />C. Pressure chemical grout shall be DeNeef, Inc., Oil-free Oakum and Hydro Active Sealfoam <br />or Hydro Active Flex LV grout, Scotch-Seal Chemical hydrophilic grout 5000, 5610, Avanti <br />AV-333 Injectaflex or other approved gel type chemical grout. Provide Avanti MG-AV-290 <br />hydrophobic polyurethane foam grout or other approved foam grouts for high volume <br />leaks.
The URL can be used to link to this page
Your browser does not support the video tag.