My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Protecting Existing Utilities <br />Project No. 180162 02 01 20 - 1 <br /> <br />SECTION 02 01 20 <br />PROTECTING EXISTING UTILITIES <br />PART 1 GENERAL <br />1.01 DESCRIPTION <br />A. This Section includes materials and procedures for protecting existing underground <br />utilities during performance of the Work. Provide all necessary labor, equipment, <br />material, and services to protect existing utilities. <br />B. Perform Utility location in accordance with Section 02 01 10, Existing Utilities, <br />Coordination and Location. <br />C. Numerous parallel and crossing utilities are in close proximity to the Work which may or <br />may not lie within the Contractor’s excavation/trench zone. The cost of protection, <br />supporting, verification of condition (Pre- or Post-construction) and repair or replacement <br />of damaged or disturbed facilities will be at the expense of the Contractor and included in <br />the bid item to which the Work is appurtenant. <br />1. Utilities shall be maintained in service at all times unless otherwise specified. Any <br />disruption of service must be coordinated with and approved by the Utility Owner in <br />writing. <br />2. Where necessary, provide temporary service and maintain service with bypass or <br />highlining operations as necessary to maintain service. <br />3. Any disruption of service shall be the responsibility of the Contractor. <br />D. Protecting existing underground utilities. <br />1. Where required to perform the work, shoring shall be provided to maintain side <br />support as the trench is excavated. The Contractor shall be responsible for the design <br />of support systems and any costs for replacing utilities that are damaged as a result <br />of their activities. <br />2. Provide necessary designs for sheeting, shoring, and other protection in accordance <br />with Section 31 50 00, Excavation Support and Protection. <br />E. Protecting existing overhead utilities <br />1. Where work is performed near existing overhead utilities, coordinate work to meet <br />safety requirements, prevent schedule delays or damage to utilities. <br />F. Utility Relocation <br />1. Relocate existing utility as required to complete the Work. Cost of relocation shall be <br />included in the associated bid items and included in the submitted construction <br />schedule. <br />1.02 RELATED SECTIONS <br />A. This section contains specific references to the following related sections. Additional <br />related sections may apply that are not specifically listed below. <br />1. Section 02 01 10, Existing Utilities, Coordination and Location. <br />2. Section 31 50 00, Excavation Support and Protection
The URL can be used to link to this page
Your browser does not support the video tag.