Laserfiche WebLink
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Repair <br />Project No. 180162 03 01 00 - 1 <br /> <br />SECTION 03 01 00 <br />CONCRETE REPAIR <br />PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section includes concrete rehabilitation of existing structures. <br />1. Inspection by Engineer and Contractor to identify areas in need of repair and extent <br />of repair expected. <br />2. Repair by Contractor, as coordinated with product manufacturers for final product <br />selections, in accordance with this specification and drawings, including preparation, <br />repair, and protective coating. <br />3. Materials for reinforcement steel modifications below and for cast-in-place concrete <br />construction for new walls shall comply with specification section 03 20 00 Concrete <br />Reinforcing. <br />1.02 UNIT PRICE <br />A. Work includes cost of preparing existing construction to receive Work indicated, <br />installation of repair products, curing, and costs of field quality control. <br />1.03 RELATED SECTIONS <br />A. Section 01 12 16 – Work Sequence <br />B. Section 03 20 00 – Concrete Reinforcing <br />C. Section 03 30 00 – Cast-In-Place Concrete <br />D. Section 09 96 00 – High Performance Coatings for Water and Wastewater <br />1.04 REFERENCE <br />A. The references listed below are a part of this section as specified and modified. Where a <br />referenced document contains references to other standards, those documents are <br />included as references under this section as if referenced directly. In the event of <br />conflict between requirements of this section and those of listed documents, <br />requirements of this section prevail.