My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Forming <br />Project No. 180162 03 11 00 - 6 <br /> <br />H. In all cases, proceed with curing same day as form removal. <br />I. Where no reshoring is planned, forms and shoring used to support weight of concrete <br />shall be left in place until concrete has attained its specified 28-day compressive <br />strength. <br />3.05 RESHORING <br />A. Do not impose construction loads or remove shoring from any part of the structure until <br />that portion of the structure, in combination with remaining forming and shoring systems, <br />has sufficient strength to safely support its weight and loads placed thereon. <br />B. While reshoring is underway, no superimposed dead or live loads are permitted on the <br />new construction. <br />C. During reshoring, do not subject concrete in structural members to combined dead and <br />construction loads in excess of loads that the structural members can adequately <br />support. <br />D. Place reshores as soon as practicable after stripping operations are complete, but in no <br />case later than the end of working day on which stripping occurs. <br />E. Place reshores to carry their required loads without overstressing. <br />F. Where a reshoring procedure is planned, supporting formwork may be removed when <br />concrete has reached the concrete strength specified by the formwork engineer’s <br />structural calculations and verified by field cured test cylinders or other approved <br />method. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.