My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 1:43:27 PM
Creation date
4/21/2026 1:34:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 2
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer - Construction Package 2 Concrete Reinforcing <br />Project No. 180162 03 20 00 - 1 <br /> <br />SECTION 03 20 00 <br />CONCRETE REINFORCING <br />PART 1 GENERAL <br />1.01 DESCRIPTION <br />A. Section includes: Reinforcing steel for use in reinforced concrete. <br />1.02 REFERENCES <br />A. The references listed below are a part of this section. Where a referenced document <br />contains references to other standards, those documents are included as references <br />under this section as if referenced directly. In the event of conflict between the <br />requirements of this section and those of the listed documents, the requirements of this <br />section shall prevail. <br /> <br />Reference Title <br />ACI 117 Specification for Tolerances for Concrete Construction and Materials <br />ACI 315 Details and Detailing of Concrete Reinforcement <br />ACI 318 Building Code Requirements For Structural Concrete <br />ACI SP-66 ACI Detailing Manual <br />ASTM A615 Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement <br />ASTM A706 Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement <br />ASTM A1064 Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for <br />Concrete <br />AWS D1.4 Structural Welding Code - Reinforcing Steel <br />CRSI-PRB Placing Reinforcing Bars <br />CRSI-MSP Manual of Standard Practice <br />1.03 SUBMITTALS <br />A. Action Submittals <br />1. Procedures: Section 01 33 00. <br />2. A copy of this specification section with each paragraph check-marked to indicate <br />specification compliance or marked to indicate requested deviations from <br />specification requirements. <br />3. Check-marks () shall denote full compliance with a paragraph as a whole. <br />Deviations shall be underlined and denoted by a number in the margin to the right of <br />the identified paragraph. The remaining portions of the paragraph not underlined will <br />signify compliance on the part of the Contractor with the specifications. Include a <br />detailed, written justification for each deviation. Failure to include a copy of the <br />marked-up specification sections, along with justification(s) for any requested <br />deviations to the specification requirements, with the submittal shall be sufficient <br />cause for rejection of the entire submittal with no further consideration. <br />4. Mill certificates of mill analysis, tensile, and bend tests for all reinforcing. <br />5. Manufacturer and type of proprietary reinforcing steel splices. Submit a current ICC <br />Report and manufacturer’s literature that contains instructions and <br />recommendations for each type of coupler used.
The URL can be used to link to this page
Your browser does not support the video tag.