My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EASEMENT AFN 201907310975 <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL405 <br />29051900201000 <br />UNKNOWN <br />EASEMENT AFN 201907310975 <br />361LF <br /> <br />C <br />O <br />N <br />C <br /> <br />G <br />U <br />T <br />T <br />E <br />R <br /> <br />T <br />O <br /> <br />C <br />B <br />7 <br />SAWCTSAWCT <br />TCETCETCETCETCETCETCETCETCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT SAWCT SAWCT <br />EX FENCE <br />EX 32" HDPE DWO <br />PORT OF EVERETT <br />NORTON TERMINAL <br />APPROXIMATE LOCATION OF <br />TRENCHLESS LAUNCH PIT <br />BNSF ROWLIMITS OF EXISTING CITY <br />UTILITY EASEMENT <br />BNSF ROW <br />LIMITS OF TCE AREA 2. <br />SEE G-2014 <br />APPROXIMATE LIMITS OF EXISTING <br />FOUNDATION AND PILES <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />APPROXIMATE EXTENTS OF <br />H-PILES AND FOUNDATION <br />LIMITS OF TCE AREA 3. <br />SEE G-2014 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\XXX DEMO\SHEETS\CX-2001.DWGPlot date 12/8/2025 9:03 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />DEMOLITION <br />NORTON TERMINAL <br />EXISTING IMPROVEMENTS DEMOLITION - 1 <br />CX-2001 <br />11 <br />R. DAVIES, P. VENC <br />T. FRANKLIN <br />R. DAVIES <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />Know what's below. <br />before you dig.Call <br />R <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNER'S. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />3.NORTON TERMINAL IMPROVEMENTS SHOWN <br />BASED ON BEST AVAILABLE RECORD INFORMATION. <br />REMOVE AND REPLACE IMPROVEMENTS AS <br />REQUIRED TO COMPLETE THE WORK. CONTRACTOR <br />SHALL DETERMINE THE ACTUAL LIMITS REMOVED <br />BASED ON THEIR APPROVED TRENCHING AND <br />RESTORATION PLANS. <br />4.SEE ADDITIONAL DEMOLITION REQUIREMENTS IN <br />SECTION 02 41 00.MATCHLINE SEE DRAWING CX-20021 DEMOLISH EXISTING SECURITY FENCE WHERE <br />REQUIRED TO COMPLETE THE WORK. PORT SITE <br />SECURITY MUST BE MAINTAINED AT ALL TIMES. SEE <br />ADDITIONAL REQUIREMENTS PER SECTION 01 12 16 <br />WORK SEQUENCE. <br />GENERAL NOTES <br />KEY NOTES <br />1 <br />10 402020FEET0 <br />12/09/2025 <br />226c099ba91f0d10139fb53888e681d4
The URL can be used to link to this page
Your browser does not support the video tag.