My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL102 <br />111 <br />406 <br />29051900201500 <br />UNKNOWN <br />29051900200900 <br />UNKNOWN 29051900201100 UNKNOWNEASEMENT AFN 201907310975XX <br />XXXXXXXXXXXXXXXXXXXXXXXXXXXSAWCT SAWCT SAWCT <br />TCETCETCETCETCETCETCETCETCETCETCETCETCETCE <br />SAWCT SAWCT SAWCT SAWCT <br />SAWCT <br />SAWCT <br />SAWCT <br />EX 32" HDPE DWO <br />EX FENCE <br />SNOPUD 15 KV POWER DUCT <br />BANK (PROTECT IN PLACE)13 <br />11.5'± <br />A <br />- <br />5 <br />67 <br />4 <br />1 <br />12 <br />3 <br />9 <br />10 <br />2 <br />1 <br />BNSF ROWPORT OF EVERETT <br />NORTON TERMINAL <br />LIMIT OF EXISTING CITY <br />UTILITY EASEMENT <br />C <br />- <br />B <br />- <br />BNSF ROW <br />TEMPORARY CONSTRUCTION <br />EASEMENT. SEE G-2014. <br />EX FENCE14 <br />11 <br />SNOPUD TRANSMISSION POLES AND <br />ANCHORS SEE GENERAL NOTE 2. <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />PE AREA 5 <br />EXISTING CURB <br />AND MEDIAN <br />4 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\XXX DEMO\SHEETS\CX-2002.DWGPlot date 12/8/2025 9:06 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />DEMOLITION <br />NORTON TERMINAL <br />EXISTING IMPROVEMENTS DEMOLITION - 2 <br />CX-2002 <br />12 <br />R. DAVIES, P. VENC <br />T. FRANKLIN <br />R. DAVIES <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />Know what's below. <br />before you dig.Call <br />R <br />GENERAL NOTES <br />KEY NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE TO <br />EXACTLY LOCATE AND PROTECT ALL EXISTING UTILITY <br />FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNER'S. SEE <br />SECTION 02 01 10 AND SECTION 02 01 20. <br />3.NORTON TERMINAL IMPROVEMENTS SHOWN BASED <br />ON BEST AVAILABLE RECORD INFORMATION. REMOVE <br />AND REPLACE IMPROVEMENTS AS REQUIRED TO <br />COMPLETE THE WORK. CONTRACTOR SHALL <br />DETERMINE THE ACTUAL LIMITS REMOVED BASED ON <br />THEIR APPROVED TRENCHING AND RESTORATION <br />PLANS. <br />4.SEE ADDITIONAL DEMOLITION REQUIREMENTS IN <br />SECTION 02 41 00. <br />5.SEE EX-2001 FOR ELECTRICAL, COMMUNICATION AND <br />POWER DEMO AND RELOCATION. <br />PLAN <br />SCALE: 1"=20"MATCHLINE SEE DRAWING CX-2001SCALE: <br />EXISTING PERIMETER FENCE <br />NTS <br />A <br />- <br />1 <br />2 <br />1 DEMOLISH EXISTING SECURITY FENCE WHERE REQUIRED <br />TO COMPLETE THE WORK. PORT SITE SECURITY MUST <br />BE MAINTAINED AT ALL TIMES. SEE ADDITIONAL <br />REQUIREMENTS PER SECTION 01 12 16 WORK <br />SEQUENCE. <br />2 REMOVE AND REPLACE EXISTING GATE IN KIND. <br />3 REMOVE AND REPLACE EXISTING NORTH GATE 2-15' <br />SWING GATES, 4' PERSONNEL GATE, AND 2-12' SWING <br />GATES IN KIND. <br />4 REMOVE AND REPLACE EXISTING 30' LOW-MAST LIGHT <br />POLES. COORDINATE WORK WITH CITY AND PORT. <br />5 PROTECT EXISTING PORT COMMUNICATION FACILITIES <br />IN PLACE WITHIN THE THE WORK AREA. COORDINATE <br />WORK AND REMOVAL AND REPLACEMENT OF <br />CONFLICTING CONDUIT OR OTHER ANCILLARY ITEMS <br />WITH CITY AND PORT. <br />6 PROTECT EXISTING PORT POWER FACILITIES IN PLACE <br />WITHIN THE THE WORK AREA. COORDINATE WORK <br />AND REMOVAL AND REPLACEMENT OF CONFLICTING <br />CONDUIT OR OTHER ANCILLARY ITEMS WITH CITY AND <br />PORT. <br />7 RESTORE EXISTING GRADE TO MATCH ORIGINAL <br />CONDITIONS. <br />8 REMOVE AND RESTORE EXISTING PAVEMENT PER <br />DETAIL 1 AND 2/CX-2011. <br />9 REMOVE AND REPLACE EXISTING 4' PERSONNEL GATE IN <br />KIND. <br />10 PROTECT IN PLACE OR REMOVE AND REPLACE EXISTING <br />2-12' SWING GATES IN KIND. <br />11 PROTECT IN PLACE 30' LOW-MAST LIGHT POLES IN KIND. <br />12 PROTECT IN PLACE OR REMOVE AND REPLACE FLAG <br />POLE IN KIND. <br />13 PROTECT IN PLACE EX SNOPUD DUCT BANK. LOCATE <br />PRIOR TO TRENCHING. ADJUST SHORING TO <br />ACCOMMODATE DUCT BANK AND MAINTAIN SUPPORT. <br />14 PORT TO RELOCATE EXISTING SECURITY CAMERA PRIOR <br />TO BEGINNING WORK. <br />15 REMOVE AND REPLACE EXISTING CURB AND <br />LANDSCAPING AS REQUIRED TO PROVIDE ACCESS <br />THROUGH SITE. PROVIDE TEMPORARY HAUL ROAD OR <br />ASPHALT. RESTORE TO PRE-CONSTRUCTION CONDITION <br />UPON COMPLETION OF THE WORK. <br />SCALE: <br />EXISTING NORTH GATE <br />NTS <br />B <br />-SCALE: <br />EXISTING SWING GATE <br />NTS <br />C <br />- <br />1 <br />4 <br />3 9 <br />12 <br />12 <br />9 10 <br />1 <br />11 <br />11 <br />14 <br />10 402020FEET0 <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.