Laserfiche WebLink
EASEMENT AFN 201907310975 <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL405 <br />29051900201000 <br />UNKNOWN <br />EASEMENT AFN 201907310975 <br />361LF <br /> <br />C <br />O <br />N <br />C <br /> <br />G <br />U <br />T <br />T <br />E <br />R <br /> <br />T <br />O <br /> <br />C <br />B <br />7 <br />SAWCTSAWCT <br />TCETCETCETCETCETCETCETCETCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT SAWCT SAWCT <br />EX FENCE <br />EX 32" HDPE DWO <br />APPROXIMATE LOCATION OF <br />TRENCHLESS LAUNCH PIT <br />F <br />CD-2609B-1 <br />BNSF ROWPORT OF EVERETT <br />NORTON TERMINAL <br />APPROXIMATE LOCATION OF <br />EXISTING FOUNDATION AND PILES <br />LIMITS OF EXISTING CITY <br />UTILITY EASEMENT <br />APPROXIMATE LIMITS OF <br />EXISTING FOUNDATION PILES <br />BNSF ROW <br />LIMIT OF TCE AREA 2. <br />SEE G-2014 <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />LIMIT OF TCE AREA 3. <br />SEE G-2014 <br />BUILDING OR STRUCTURE FOUNDED ON <br />STEEL H-PILES. <br />NON-BUILDING FOUNDED ON STEEL & <br />TIMBER PILES. <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\XXX DEMO\SHEETS\CX-2021.DWGPlot date 12/8/2025 9:14 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />DEMOLITION <br />NORTON TERMINAL <br />EXISTING PILE AND FOUNDATION <br />DEMOLITION - 1 <br />CX-2021 <br />15 <br />R. DAVIES, P. VENC <br />T. FRANKLIN <br />R. DAVIES <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />Know what's below. <br />before you dig.Call <br />R <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNER'S. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />3.LIMITS OF PILE AND FOUNDATIONS ARE SHOWN <br />BASED ON BEST AVAILABLE RECORD INFORMATION. <br />EXISTING PILE AND FOUNDATION DEMOLITION <br />SHALL BE PERFORMED AS REQUIRED TO COMPLETE <br />THE WORK. CONTRACTOR SHALL DETERMINE THE <br />ACTUAL LIMITS REMOVED BASED ON THEIR <br />APPROVED TRENCHING AND RESTORATION PLANS. <br />4.SEE ADDITIONAL DEMOLITION REQUIREMENTS IN <br />SECTION 02 41 00.MATCHLINE SEE SHEET CX-2022EXAMPLE OF PILE SUPPORTED <br />B <br />-SCALE: <br />FOUNDATION NORTON TERMINAL <br />NTS <br />1 DEMOLISH REINFORCED CONCRETE FOUNDATION, <br />STEEL, AND TIMBER PILES AS REQUIRED TO <br />COMPLETE THE WORK. BURIED FOUNDATION AND <br />H-PILES. <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />10 402020FEET0 <br />12/09/2025