Laserfiche WebLink
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL102 <br />111 <br />406 <br />29051900201500 <br />UNKNOWN <br />29051900200900 <br />UNKNOWN 29051900201100 UNKNOWNEASEMENT AFN 201907310975XX <br />XXXXXXXXXXXXXXXXXXXXXXXXXXXSAWCT SAWCT SAWCT <br />TCETCETCETCETCETCETCETCETCETCETCETCETCETCE <br />SAWCT SAWCT SAWCT SAWCT <br />SAWCT <br />SAWCT <br />SAWCT <br />EX 32" HDPE DWO <br />EX FENCE <br />F <br />CD-2609 <br />31 <br />BNSF ROWPORT OF EVERETT <br />NORTON TERMINAL <br />NORTON TERMINAL <br />ASPHALT PAVEMENT <br />MULTILAYER GEOGRID <br />2 <br />CX-2011 <br />LIMIT OF EXISTING CITY <br />UTILITY EASEMENT <br />43+0044+0045+0046+0047+00STA. 44+62± <br />APPROXIMATE LOCATION OF <br />EXISTING PAVEMENT CHANGE <br />RESTORE EXIST SURFACE <br />IN-KIND. RESTORE PAVEMENT <br />PER COE REQUIREMENTS IN <br />LOWER NORTON ROW. <br />STA. 44+82± <br />APPROXIMATE LOCATION OF <br />EXISTING PAVEMENT CHANGE <br />BNSF ROW <br />SNOPUD TRANSMISSION <br />POLES AND ANCHORS <br />SEE GENERAL NOTE 2. <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />PE AREA 5 <br />LIMIT OF TCE AREA 3. <br />SEE G-2014 <br />LIMIT OF TCE AREA 2. <br />SEE G-2014 <br />EXISTING CURB AND MEDIAN 4 <br />2" MILL AND HMA PAVEMENT <br />PLANTING RESTORATION IN KINDHMA PAVEMENT MULTI-LAYER GEOGRID. <br />SEE DETAIL 2/CX-2011. <br />9" ASPHALT PAVEMENT OVER 12" CSBC. <br />SEE DETAIL 1/CX-2011. <br />HMA PAVEMENT, FULL DEPTH <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\XXX DEMO\SHEETS\CX-2012.DWGPlot date 12/8/2025 8:49 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />DEMOLITION <br />NORTON TERMINAL <br />EXISTING PAVEMENT DEMOLITION - 2 <br />CX-2012 <br />14 <br />R. DAVIES, P. VENC <br />T. FRANKLIN <br />R. DAVIES <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br /> <br />Know what's below. <br />before you dig.Call <br />R <br />PLAN <br />SCALE: 1"=20"MATCHLINE SEE DRAWING CX-20111.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE <br />TO EXACTLY LOCATE AND PROTECT ALL EXISTING <br />UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNER'S. <br />SEE SECTION 02 01 10 AND SECTION 02 01 20. <br />3.LIMITS OF PAVEMENT ARE SHOWN BASED ON BEST <br />AVAILABLE RECORD INFORMATION. EXISTING <br />PAVEMENT DEMOLITION SHALL BE PERFORMED AS <br />REQUIRED TO COMPLETE THE WORK. CONTRACTOR <br />SHALL DETERMINE THE ACTUAL LIMITS REMOVED <br />BASED ON THEIR APPROVED TRENCHING AND <br />RESTORATION PLANS. <br />4.SEE ADDITIONAL DEMOLITION REQUIREMENTS IN <br />SECTION 02 41 00. <br />5.FINAL SAW CUT SHALL BE DONE TO ACCURATE, NEAT <br />AND STRAIGHT LINES. PROVIDE SAND FOR CRACK <br />SEALING PER WSDOT/APWA 5.03.3(3)B2 AND JOINT <br />SEALANT PER 9-04.2. <br />6.ALL STRIPING, MARKERS, AND SURFACE <br />IMPROVEMENTS REMOVED OR DAMAGED BY THE <br />WORK MUST BE REPLACED TO THE PORT'S <br />REQUIREMENTS. <br />1 PROVIDE INITIAL SAWCUT TO REMOVE EXISTING <br />PAVEMENT. WHERE PRESENT, CUT EXISTING <br />GEOTEXTILE/GEOGRID. TAKE CARE TO MINIMIZE <br />DAMAGE TO THE MATERIAL DURING THE REMOVAL <br />AT THE SAW CUT BOUNDARY. <br />3 PROVIDE FINAL SAW CUT AND RESTORATION OF <br />GEOTEXTILE/GEOGRID PER DETAIL 2/CX-2011. <br />4 REMOVE AND REPLACE EXISTING CURB AND <br />LANDSCAPING AS REQUIRED TO PROVIDE ACCESS <br />THROUGH SITE. PROVIDE TEMPORARY HAUL ROAD <br />OR ASPHALT. RESTORE TO PRE-CONSTRUCTION <br />CONDITION UPON COMPLETION OF THE WORK. <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />10 402020FEET0 <br />12/09/2025