Laserfiche WebLink
25TH ST23RD STSTART 48" SD CO20 <br />STA. 21+73.88 <br />END 48" SD CO20 <br />STA. 40+46.70 <br />LOWER NORTO <br />N <br /> <br />A <br />V <br />E <br />WEST MARINE VIEW DRIVE <br />C-2306 <br />C-2308 <br />C-2309 <br />C-230723+0 <br />0 <br />24+00 25+00 26+00 27+00 28+0029+0030+00 31+00 <br />32+00 <br />33+00 <br />34+00 <br />35+00 <br />36+00 <br />37+00 <br />38+00 <br />39+00 <br />40+00 <br />PRETREATMENT UNIT #2A <br />SEE C-2350 <br />WORK ORDER UP3815-01 <br />(BY OTHERS) <br />WO UP3525 <br />(BY OTHERS) <br />NORTON TERMINAL <br />CO20 <br />SEE C-2801 <br />BNSF TRENCHLESS <br />CROSSING25TH ST23RD STSTART 24" SS CO28 <br />STA. 10+00.00 <br />END 24" SS CO28 <br />STA. 27+87.69 <br />LOWER NORTO <br />N <br /> <br />A <br />V <br />E <br />WEST MARINE VIEW DRIVE10+0 <br />0 <br />11+00 <br />12+00 13+00 14+00 15+0016+0017+00 18+00 19+00 <br />20+00 <br />21+00 <br />22+00 <br />23+00 <br />24+00 <br />25+00 <br />26+00 27+00 28+00WO UP3525 <br />(BY OTHERS) <br />NORTON TERMINAL <br />C-2206 <br />C-2208 <br />C-2209 <br />C-2207CO28 <br />SEE C-2801 <br />BNSF TRENCHLESS <br />CROSSING25TH ST23RD STSTART 48" SS CO19 <br />STA. 31+81.02 <br />BEGIN WO UP3815-02 <br />48" PGSF FEED <br />STA. 46+96.42 <br />SEE C-2351 <br />LOWER NORTO <br />N <br /> <br />A <br />V <br />E <br />WEST MARINE VIEW DRIVE <br />33+0 <br />0 34+00 35+00 36+00 37+00 38+0039+0040+00 41+00 <br />42+00 <br />43+00 <br />44+00 <br />45+00 <br />46+00 <br />47+00 <br />48+00 <br />49+00 <br />50+00 <br />WORK ORDER UP3815-01 <br />(BY OTHERS) <br />WO UP3525 <br />(BY OTHERS) <br />50+40 <br />51+00 <br />24" PGSF FEED <br />STA. 49+19.54 <br />SEE C-2351 <br />16" PGSF FEED <br />STA. 50+16.65 <br />SEE C-2352 <br />NORTON TERMINAL <br />C-2106 <br />C-2108 <br />C-2109 <br />C-2107C019 <br />C019 <br />C001 <br />STA 47+08.17CO01CO19SEE C-2801 <br />BNSF TRENCHLESS <br />CROSSING <br />Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2030.DWGPlot date 12/8/2025 10:24 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br />   <br />CIVIL <br />SITE AND KEY PLAN <br />C-2030 <br />17 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />STORM DRAIN KEY PLAN <br />SCALE: 1"=80' <br />GENERAL NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />40 1608080FEET0 <br />SANITARY SEWER KEY PLAN <br />SCALE: 1"=80' <br />SANITARY SEWER/COMBINED SEWER KEY PLAN <br />SCALE: 1"=80'MATCHLINE SEE DRAWING C-2031Know what's below. <br />before you dig.Call <br />R <br />COMBINED SEWER HGL <br />DWG#CO#STRUCTURE <br />NAME <br />INVERT <br />(FT) <br />HGL <br />(FT)NOTE <br />C-2106 CO19 SSMH 008 25.8 48.4 ACCESSWAY <br />C-2106 CO19 SSMH 009A 22.6 47.8 ACCESSWAY <br />C-2107 CO19 SSMH 009 9.4 45.7 ACCESSWAY BNSF CROSSING <br />(EAST) <br />C-2108 CO19 SDMH 010 7.8 44.8 ACCESSWAY BNSF CROSSING <br />(WEST) <br />C-2109 CO19 SDMH 011 4.7 41.0 ACCESSWAY <br />HGL ELEVATION BASED ON 100-YR STORM <br />SANITARY SEWER HGL <br />DWG#CO#STRUCTURE <br />NAME <br />INVERT <br />(FT) <br />HGL <br />(FT)NOTE <br />C-2206 CO28 SSMH 100 19.5 21.3 MANHOLE <br />C-2206 CO28 SSMH 101 19.2 21.0 MANHOLE <br />C-2206 CO28 SSMH 102 18.7 20.5 MANHOLE <br />C-2207 CO28 SSMH 103 9.5 10.7 MANHOLE OUTSIDE DROP <br />BNSF CROSSING (EAST) <br />C-2207 CO28 SSMH 104 7.9 9.6 MANHOLE OUTSIDE DROP <br />BNSF CROSSING (WEST) <br />C-2208 CO28 SSMH 105 5.7 7.3 MANHOLE <br />C-2209 CO28 SSMH 106 4.9 6.5 MANHOLE <br />C-2209 CO28 SSMH 107 3.7 5.2 MANHOLE <br />C-2209 CO28 SSMH 108 -1.3 1.7 MANHOLE OUTSIDE DROP <br />HGL ELEVATION BASED ON 100-YR STORM <br />STORM DRAIN HGL <br />DWG#CO#STRUCTURE <br />NAME <br />INVERT <br />(FT) <br />HGL <br />(FT)NOTE <br />C-2306 CO20 SDMH 504 26.53 38.43 ACCESSWAY <br />C-2306 CO20 SDMH 505 22.55 38.14 ACCESSWAY <br />C-2307 CO20 SDMH 507 9.42 36.92 ACCESSWAY BNSF CROSSING <br />(EAST) <br />C-2307 CO20 SDMH 508 7.76 36.35 ACCESSWAY BNSF CROSSING <br />(WEST) <br />C-2309 CO20 SDMH 509 4.72 35.5 ACCESSWAY <br />C-2306 CO20 UNIT 2A <br />DISCHARGE 24.52 38.14 PRETREATMENT UNIT <br />HGL ELEVATION BASED ON 100-YR STORM <br />12/09/2025 <br />016033ae5151879a988a08791abfe062