Laserfiche WebLink
51+00 <br />52+00 <br />53+00 <br />54+00 <br />55+00 <br />56+00 <br />57+00 <br />58+00 <br />59+00 <br />60+00 <br />61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 <br />21ST ST20TH ST19TH ST18TH ST19TH ST18TH STGRAND AVE <br />WEST MARINE VIEW DRIVE <br />C-2113C-2112 <br />C-2111 <br />C-2110 <br />50+00 <br />NAVAL STATION EVERETT <br />CO01 <br />BNSF RR <br />69+00 70+00 71+ <br />0 <br />0 <br />72+00 73+00 74+00 75+00 76+00 <br />77+00 78+00 <br />16TH ST17TH ST18TH STC-2115, C-2215C-2114, C-2214 <br />END 30" CS CO01 <br />STA. 78+54.56 <br />30" CS CO01 <br />CO01 <br />GRAND AVE <br />WEST MARINE VIEW DRIVE <br />GRAND AVENUE PARK BRIDGE <br />C:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2031.DWGPlot date 12/8/2025 10:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br />   <br />CIVIL <br />SITE AND KEY PLAN <br />C-2031 <br />18 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBERMATCHLINE SEE DRAWING C-203040 1608080FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />GENERAL NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20. <br />SANITARY SEWER/COMBINED SEWER KEY PLAN <br />SCALE: 1"=80'MATCHLINESEE ABOVE RIGHTMATCHLINESEE BELOW LEFTSANITARY SEWER/COMBINED SEWER KEY PLAN <br />SCALE: 1"=80'Filepath\FilenameCOMBINED SEWER HGL <br />DWG#CO#STRUCTURE <br />NAME <br />INVERT <br />(FT) <br />HGL <br />(FT)NOTE <br />C-2110 CO01 SSMH 200 -0.5 41.6 ACCESSWAY <br />C-2111 CO01 SSMH 201 1.3 42.8 ACCESSWAY <br />C-2112 CO01 SSMH 202 2.6 43.7 ACCESSWAY <br />C-2114 CO01 SSMH 203 4.3 44.9 ACCESSWAY <br />C-2115 CO01 SSMH 204 6.6 45.8 ACCESSWAY <br />HGL ELEVATION BASED ON 100-YR STORM <br />12/09/2025