My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL229 <br />230 247 <br />50278 <br />MIC <br />38.39 <br />50279 <br />MIC <br />37.38 <br />50280 <br />MIC <br />36.06 <br />00516055600000 <br />UNKNOWN <br />00437455800100 <br />2501 W MARINE VIEW DR <br />00437455601300 <br />UNKNOWN00437455902700UNKNOWN 00437455700900 <br />UNKNOWN <br />00437455701302 <br />UNKNOWN <br />00437455701200 <br />UNKNOWN <br />00437455701301 <br />UNKNOWN <br />WEST MARINE VIEW DRIVE <br />LOWER NORTON AVE <br />25TH ST40 <br />38 <br />39 <br />41 <br />42 <br />43 <br />39 <br />3 <br />5 333436 <br />3027282931323 <br />6 <br />3 <br />7 <br />38 <br />37 <br />36 <br />EX 24" SS SP <br />EX 20" W DIP <br />EX 18" SD CONC EX 24" W SP ABAND <br />EX 30" W SP ABAND <br />EX 30" W SP <br />EX 8" SS DIP <br />EX 12" SD <br />EX 12" HPG <br />EX 3/4" W CP <br />EX 3/4" W PEP <br />ELEVATED <br />WALKWAY <br />ELEVATED WALKWAY <br />ELEVATED W <br />A <br />L <br />K <br />W <br />A <br />Y <br />ELEVATED WALKWAY7.85' â„„ TO â„„EX 10" SS CLAY <br />C <br />CD-2609 <br />EX 42" SS SP <br />W <br />W <br />W <br />W W W W W <br />W <br />W <br />G <br />G GG <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />EX 6" HPG4.00' â„„ TO â„„30' BNSF OFFSET <br />10+0011+0012+0013+001+00 2+003+004+001 <br />2 <br />STA. 1+00.00 <br />N:362259.47 <br />E:1302250.72 <br />1 1 <br />STA. 2+43.51 <br />N:362390.48 <br />E:1302246.99 <br />3 2 <br />1 <br />1 <br />STA. 1+34.33 <br />N:362282.97 <br />E:1302227.98 <br />2 <br />3 <br />1 <br />COE LS5 <br />STA. 0+85.19 <br />N: 362258.67 <br />E: 1302265.49 <br />26 1 <br />4 <br />6" STW HP MAIN, PSE <br />UTILITY RELOCATION 60% <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2060.DWGPlot date 12/8/2025 10:38 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />10 402020FEET0 <br />CIVIL <br />UTILITY RELOCATION PLAN - 1 <br />C-2060 <br />22 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PLAN <br />SCALE: 1"=20"MATCHLINE SEE DRAWING C-2061Know what's below. <br />before you dig.Call <br />R <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />1 CONNECT TO EXISTING WATER MAIN IN ACCORDANCE <br />WITH SECTION 02 01 10. POTHOLE LOCATION PRIOR <br />TO PROCUREMENT OF FITTINGS AND COUPLINGS. <br />CONNECTION TO EXISTING WATER LINES MUST BE BY <br />COE FORCES. SEE C-2034. <br />2 DEMOLISH EX 16" W AND ALL APPURTENANCES. <br />REMOVE IN ITS ENTIRETY. REPLACE WITH 16" DI W <br />PER COE REQUIREMENTS. <br />3 MAINTAIN WATER SERVICE TO SEWER LIFT STATION <br />AT ALL TIMES. SCHEDULE A DISRUPTION OF SERVICE <br />WITH THE COE. <br />4 EXISTING WATER LINE CAN BE REMOVED FROM <br />SERVICE DURING INSTALLATION OF CONVEYANCE <br />PIPELINES PER SECTION 01 12 16 AND SECTION 02 01 <br />10 SOUTH OF THE PGSF FACILITY. MAINTAIN WATER <br />SERVICE AT THE PGSF FACILITY AND TO THE NORTH <br />AT ALL TIMES. <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE <br />TO EXACTLY LOCATE AND PROTECT ALL EXISTING <br />UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNERS. <br />SEE SECTION 02 01 10 AND SECTION 02 01 20. <br />GENERAL NOTES <br />WATER CONSTRUCTION NOTES <br />GAS CONSTRUCTION NOTES <br />WATER KEY NOTES <br />1 GAS LINE TO BE RELOCATED BY PSE. CONFIRM <br />LOCATION OF RELOCATED GAS. <br />1 APPROX STA. 1+00 PROVIDE: <br />(1) POTHOLE LOCATION PER WATER CONSTRUCTION <br />NOTE 1. <br />(1)CONNECT TO EX 20" W <br />(1) 20" x 16" DI REDUCER <br />(1)REMOVE AND REPLACE EX 20" W ACROSS TRENCH. <br />2 APPROX STA. 1+34 PROVIDE: <br />(1) 16" DI WYE <br />(1) BLOW OFF PER COE DETAIL 511 <br />3 APPROX STA. 2+43 PROVIDE: <br />(1) 16" DI 5.265° BEND TURN DOWN TO MEET <br />VERTICAL ALIGNMENT. <br />26 APPROX STA 0+85 PROVIDE: <br />(1)PROVIDE INSERTION VALVE PRIOR TO SHUTTING <br />DOWN EX 20" W. <br />(1)POTHOLE LOCATION FOR INSERTION VALVE <br />INSTALLATION. CONFIRM DEPTH OF COVER AND <br />VALVE ORIENTATION PRIOR TO PROCUREMENT. <br />(1)PROVIDE 20" INSERTION VALVE PER SECTION 33 <br />05 31 ON EXISTING 20" W. <br />(1)EXTENSION PER COE DETAIL 505. <br />(1)PROVIDE VALVE ANCHOR/SUPPORT. <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.