My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
C-2064 <br />C-2063 <br />C-2062 <br />C-2061 <br />C-2060 <br />WEST MARINE VIEW DRIVE <br />NORTON TERMINAL <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W W W <br />W W W W W W W <br />W W W W W <br />W W W W W W W <br />W W W W W <br />W W W W W W W <br />W W W W W <br />W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W <br />W <br />WWW W W <br />WW W <br />W W W W W <br />W W W <br />W W W W W W W W W W WW W W W W W W W <br />WW W <br />W W W <br />W W W W W W W W W W W <br />W W W W W W W W W W W <br />W W W W W W W W W W W <br />W W W <br />W W W W W W W W W W W <br />W W W W W W W W W W W <br />W W W W W W W W W W W <br />W W W <br />W W W W W W W W W W WW W W W W W W W <br />WW W <br />W W W W W W W W W W W <br />W W W <br />W W W W W W W W W W WW W W W W W W W <br />WW W <br />W W W W W <br />W W W W W W W <br />W W <br />WW W W W <br />W W <br />WW W W W <br />W W <br />WW W W W <br />W W W W W W W <br />W W W W W W W <br />W W W W W W W <br />W W W W W W W <br />W W W W W W W <br />W W W W W W W <br />W W W <br />W <br />WW <br />W <br />W <br />W <br />WWW <br />W <br />W <br />W WW <br />W <br />W <br />W <br />W <br />W WW <br />W <br />W <br />W <br />W <br />W WW <br />W <br />W <br />W <br />W <br />W <br />W <br />W WW <br />W <br />W <br />W <br />W <br />W W W W WW W W W W W W <br />W W WW W W W W W <br />WW <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W W W <br />WW W <br />W W <br />W <br />W <br />WW <br />W <br />W <br />W <br />W <br />W <br />W <br />WWW <br />W W W W W <br />W W WW W W W W W W W W W W W W W W W W W W W W W <br />W W W <br />W W W W W W W W W <br />FM <br />FM <br />FM <br />FM <br />FMFM <br />FM <br />FM <br />FM <br />FM <br />FMFM FM <br />FM <br />FM <br />FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMFM <br />19TH ST18TH STWEST MARINE VIEW DRIVE <br />C-2069C-2068C-2067C-2066 <br />C-2065 <br />GRAND AVENUE PARK BRIDGE <br />W W W W W W W W W W W W <br />WWWWWWWWWWWWWWWWW <br />W W <br />W <br />W <br />W <br />WWWWW <br />W <br />W <br />W <br />W <br />W <br />W <br />W W W W W W <br />W W W W W W W W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W <br />W W <br />W <br />W <br />W <br />W <br />W <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM FM FM FM FM FM <br />FM <br />FM <br />FM <br />FM <br />FM <br />FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMFM <br />C:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2034.DWGPlot date 12/8/2025 10:23 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />CIVIL <br />SITE AND KEY PLAN <br />C-2034 <br />21 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />UTILITY RELOCATION PLAN <br />SCALE: 1"=80' <br />A.NO CONNECTION TO THE EXISTING MAINS WILL BE <br />ALLOWED EXCEPT BY MEANS OF AN APPROVED <br />BACKFLOW PREVENTION DEVICE PRIOR TO <br />SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND <br />RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST <br />RESULTS. <br />B.CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL <br />BE MADE BY THE PUBLIC WORKS DEPARTMENT AT THE <br />CONTRACTOR'S EXPENSE. THE PUBLIC WORKS <br />DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS <br />DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC <br />WORKS DEPARTMENT SHALL THEREAFTER DETERMINE <br />THE DATE AND TIME AT WHICH THE CONNECTION <br />SHALL BE MADE. <br />C.ALL WORK AND MATERIALS MUST CONFORM TO CITY <br />OF EVERETT STANDARDS. <br />D.A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH <br />THE CITY PRIOR TO THE START OF CONSTRUCTION. THE <br />CITY OF EVERETT PUBLIC WORKS CONSTRUCTION <br />DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR <br />TO COMMENCEMENT OF CONSTRUCTION. <br />E.THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS <br />DEPARTMENT OF A PERSON WHO CAN BE CONTACTED <br />REGARDING PROBLEMS DURING CONSTRUCTION ON A <br />24 HOUR BASIS. <br />F.MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND <br />18 INCHES VERTICAL SEPARATION BETWEEN POTABLE <br />AND NON-POTABLE CONVEYANCE SYSTEMS. <br />G.ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY <br />PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL <br />VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT <br />ALL TIMES. <br />GENERAL NOTES <br />40 1608080FEET0 <br />Know what's below. <br />before you dig.Call <br />R MATCHLINE SEE BELOW LEFTMATCHLINE SEE ABOVE RIGHTUTILITY RELOCATION PLAN <br />SCALE: 1"=80'Filepath\Filename1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR ABOVE <br />THE GROUND SURFACE. THE CONTRACTOR SHALL <br />DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE TO <br />EXACTLY LOCATE AND PROTECT ALL EXISTING UTILITY <br />FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNERS. SEE <br />SECTION 02 01 10 AND SECTION 02 01 20. <br />3.EXISTING WATER LINE CAN BE REMOVED FROM <br />SERVICE DURING INSTALLATION PER SECTION 01 12 16 <br />AND SECTION 02 01 10 SOUTH OF THE PGSF FACILITY. <br />MAINTAIN WATER SERVICE AT THE PGSF FACILITY AND <br />TO THE NORTH AT ALL TIMES. <br />WATER UTILITY NOTES <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.