My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Surveyed By #### Date #### Control Monument #### City of Everett Field Book/Starting Page #### / ####Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\001 G\SHEETS\3815-02-G-2002.DWGPlot date 12/8/2025 9:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name EverettSheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> <br />GENERAL <br />DRAWING INDEX <br />G-2002 <br />2 <br />K. WEBER <br />T. FRANKLIN <br />K. WEBER <br />SHEET INDEX <br />SHEET DRAWING TITLE <br />GENERAL <br />1 G-2001 COVER <br />2 G-2002 DRAWING INDEX <br />3 G-2011 LEGEND AND STANDARD ABBREVIATIONS <br />4 G-2012 GENERAL CONSTRUCTION NOTES <br />5 G-2013 NORTON TERMINAL UTILITY STRUCTURE LOADING CRITERIA <br />6 G-2014 NORTON TERMINAL TEMPORARY CONSTRUCTION ACCESS <br />7 G-2015 NORTON TERMINAL TCE ENLARGEMENT PLAN 1 <br />8 G-2016 NORTON TERMINAL TCE ENLARGEMENT PLAN 2 <br />SURVEY <br />9 V-2021 SURVEY CONTROLS 1 <br />10 V-2022 SURVEY CONTROLS 2 <br />DEMOLITION <br />11 CX-2001 NORTON TERMINAL IMPROVEMENT DEMOLITION - 1 <br />12 CX-2002 NORTON TERMINAL IMPROVEMENT DEMOLITION - 2 <br />13 CX-2011 NORTON TERMINAL PAVEMENT DEMOLITION - 1 <br />14 CX-2012 NORTON TERMINAL PAVEMENT DEMOLITION - 2 <br />15 CX-2021 NORTON TERMINAL PILE AND FOUNDATION DEMOLITION - 1 <br />16 CX-2022 NORTON TERMINAL PILE AND FOUNDATION DEMOLITION - 2 <br />CIVIL PLAN AND PROFILES <br />17 C-2030 SITE AND KEY PLAN <br />18 C-2031 SITE AND KEY PLAN <br />19 C-2032 SITE AND KEY PLAN <br />20 C-2033 SITE AND KEY PLAN <br />21 C-2034 SITE AND KEY PLAN <br />22 C-2060 UTILITY RELOCATION PLAN - 1 <br />23 C-2061 UTILITY RELOCATION PLAN - 2 <br />24 C-2062 UTILITY RELOCATION PLAN - 3 <br />25 C-2063 UTILITY RELOCATION PLAN - 4 <br />26 C-2064 UTILITY RELOCATION PLAN - 5 <br />27 C-2065 UTILITY RELOCATION PLAN - 6 <br />28 C-2066 UTILITY RELOCATION PLAN - 7 <br />29 C-2067 UTILITY RELOCATION PLAN - 8 <br />30 C-2068 UTILITY RELOCATION PLAN - 9 <br />31 C-2069 UTILITY RELOCATION PLAN - 10 <br />32 C-2106 WMVD - 48" CS PLAN AND PROFILE - STA 31+60 TO 36+60 <br />33 C-2107 WMVD - 48" CS PLAN AND PROFILE - STA 36+60 TO 40+40 <br />34 C-2108 LOWER NORTON AVE - 48" CS PLAN AND PROFILE - STA 40+40 TO 45+40 <br />35 C-2109 LOWER NORTON AVE - 48" - 30" CS PLAN AND PROFILE - STA 45+40 TO 50+40 <br />36 C-2110 LOWER NORTON AVE - 30" CS PLAN AND PROFILE - STA 50+40 TO 54+80 <br />37 C-2111 LOWER NORTON AVE - 30" CS PLAN AND PROFILE - STA 54+80 + 59+80 <br />38 C-2112 WMVD - 30" CS PLAN AND PROFILE - STA 59+80 TO 64+80 <br />39 C-2113 WMVD - 30" CS PLAN AND PROFILE - STA 64+80 TO 69+80 <br />40 C-2114 WMVD - 30" CS PLAN AND PROFILE - STA 69+80 TO 74+80 <br />41 C-2115 WMVD - 30" CS PLAN AND PROFILE - STA 74+80 TO 78+60 <br />42 C-2206 WMVD - 24" SS PLAN AND PROFILE - STA 9+80 TO 14+00 <br />43 C-2207 WMVD - 24" SS PLAN AND PROFILE - STA 14+00 TO 17+80 <br />44 C-2208 LOWER NORTON AVE - 24" SS PLAN AND PROFILE - STA 17+80 TO 22+80 <br />45 C-2209 LOWER NORTON AVE - 24" SS PLAN AND PROFILE - STA 22+80 TO 28+00 <br />46 C-2210 LOWER NORTON AVE - 20" SS PLAN AND PROFILE - STA 19+80 TO 23+20 <br />47 C-2211 LOWER NORTON AVE - 20" SS PLAN AND PROFILE - STA 23+20 TO 27+20 <br />48 C-2212 20TH STREET - 18" SS PLAN AND PROFILE - STA 27+20 TO 31+60 <br />49 C-2213 20TH STREET - 18" SS PLAN AND PROFILE - STA 31+60 TO 36+00 <br />50 C-2214 WMVD - 12" SS PLAN AND PROFILE - STA 19+80 TO 22+40 <br />51 C-2215 WMVD - 12" SS PLAN AND PROFILE - STA 22+40 TO 25+40 <br />52 C-2306 WMVD - 48" SD PLAN AND PROFILE - STA 21+60 TO 26+60 <br />53 C-2307 WMVD - 48" SD PLAN AND PROFILE - STA 26+60 TO 30+40 <br />54 C-2308 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 30+40 TO 35+40 <br />55 C-2309 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 35+40 TO 40+60 <br />56 C-2310 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 20+00 TO 24+40 <br />57 C-2311 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 24+40 TO 29+40 <br />58 C-2312 WMVD - 48" SD PLAN AND PROFILE - STA 29+40 TO 34+40 <br />59 C-2313 WMVD - 48" SD PLAN AND PROFILE - STA 34+40 TO 39+40 <br />60 C-2314 WMVD - 48" SD PLAN AND PROFILE - STA 39+40 TO 44+40 <br />61 C-2315 WMVD - 48" SD PLAN AND PROFILE - STA 44+40 TO 47+40 <br />62 C-2350 WMVD - EXPANDED VIEW AND STORM DRAIN PROFILES <br />63 C-2351 PGSF CONNECTION EXPANDED VIEWS - 1 <br />64 C-2352 PGSF CONNECTION EXPANDED VIEWS - 2 <br />65 C-2353 WMVD - DETENTION PIPE REPLACEMENT PROFILE <br />PAVEMENT RESTORATION <br />66 C-2401 WMVD AND LOWER NORTON AVE PLAN <br />67 C-2402 LOWER NORTON AVE PLAN <br />68 C-2403 WMVD AND LOWER NORTON AVE PLAN <br />69 C-2404 WMVD PLAN <br />70 C-2405 WMVD PLAN <br />71 C-2406 20TH STREET PLAN <br />TEMPORARY EROSION & SEDIMENT CONTROL <br />72 C-2501 WMVD AND LOWER NORTON AVE PLAN <br />73 C-2502 LOWER NORTON AVE PLAN <br />74 C-2503 LOWER NORTON AND WMVD PLAN <br />75 C-2504 WMVD PLAN <br />76 C-2505 WMVD PLAN <br />77 C-2506 20TH ST PLAN <br />CIVIL DETAILS <br />78 CD-2601 PRESSURE MH ACCESS STRUCTURES <br />79 CD-2602 TRENCH DETAILS <br />80 CD-2603 FLOW METER VAULT <br />81 CD-2604 EXISTING TRANSITION STRUCTURE <br />82 CD-2605 TRANSITION STRUCTURE <br />83 CD-2606 STANDPIPE DETAILS <br />84 CD-2607 STANDPIPE DETAILS <br />85 CD-2608 TRENCH AND PAVEMENT RESTORATION DETAILS <br />86 CD-2609 PIPING SECTIONS <br />87 CD-2610 PIPING SECTIONS <br />88 CD-2611 TESC DETAILS <br />89 CD-2612 STRUCTURE ENLARGEMENT PLANS <br />90 CD-2613 SECURITY FENCING DETAILS <br />TRENCHLESS WORK <br />91 C-2801 BNSF CROSSING PLAN <br />92 C-2802 BNSF CROSSING PROFILE 48" SEWER <br />93 C-2803 BNSF CROSSING PROFILE 48" STORM <br />94 C-2804 BNSF CROSSING PROFILE 24" SEWER <br />95 C-2805 BNSF CROSSING CASING DETAILS <br />STORMWATER TREATMENT <br />96 C-5001 PGSF STORMWATER TREATMENT PLAN <br />97 C-5002 PGSF STORMWATER TREATMENT SECTIONS <br />STANDARD DETAILS <br />98 CD-4001 STANDARD DETAILS STD DETAIL 201, 210, 212, 214 <br />99 CD-4002 STANDARD DETAILS STD DETAIL 302, 303, 305, 307 <br />100 CD-4003 STANDARD DETAILS STD DETAIL 312, 326, 401, 402 <br />101 CD-4004 STANDARD DETAILS STD DETAIL 405, 412, 511, 515 <br />102 CD-4005 STANDARD DETAILS STD DETAIL 505, 604, 605 <br />103 CD-4006 STANDARD DETAILS STD DETAIL 606, 607, 608, 609 <br />104 CD-4007 STANDARD DETAILS STD DETAIL 610, 611, 612, 614 <br />105 CD-4008 STANDARD DETAILS STD DETAIL 615, 616, 618 <br />STRUCTURAL <br />106 S-2604 TRANSITION STRUCTURE PLANS <br />107 S-2605 TRANSITION STRUCTURE SECTIONS <br />108 S-2606 STANDPIPE SUPPORT PLAN AND ELEVATIONS <br />109 S-2607 STANDPIPE SUPPORT DETAILS <br />110 S-4001 STRUCTURAL GENERAL NOTES <br />111 S-4002 STRUCTURAL SPECIAL INSPECTIONS <br />112 S-4003 STANDARD DETAILS 1 <br />113 S-4004 STANDARD DETAILS 2 <br />114 S-4005 STANDARD DETAILS 3 <br />115 S-4006 STANDARD DETAILS 4 <br />ELECTRICAL DEMOLITION <br />116 EX-2001 NORTON TERMINAL IMPROVEMENT DEMOLITION <br />TRAFFIC CONTROL <br />117 TC2-1 TRAFFIC CONTROL PLAN 1 <br />118 TC2-2 TRAFFIC CONTROL PLAN 2 <br />119 TC2-3 TRAFFIC CONTROL PLAN 3 <br />120 TC2-4 TRAFFIC CONTROL PLAN 4 <br />121 TC2-5A TRAFFIC CONTROL PLAN 5A <br />122 TC2-5B TRAFFIC CONTROL PLAN 5B <br />123 TC2-6 TRAFFIC CONTROL PLAN 6 <br />124 TC2-7 TRAFFIC CONTROL PLAN 7 <br />125 TC2-8 TRAFFIC CONTROL PLAN 8 <br />126 TC2-9 TRAFFIC CONTROL PLAN 9 <br />127 TC2-10 TRAFFIC CONTROL PLAN 10 <br />128 TC2-11 TRAFFIC CONTROL PLAN 11 <br />129 TC2-12 TRAFFIC CONTROL PLAN 12 <br />130 TC2-13 TRAFFIC CONTROL PLAN 13 <br />131 TC2-14 TRAFFIC CONTROL PLAN 14 <br />132 TC2-15 TRAFFIC CONTROL PLAN 15 <br />133 TC2-16 TRAFFIC CONTROL PLAN 16 <br />134 TC2-17 TRAFFIC CONTROL PLAN 17 <br />135 TC2-18 TRAFFIC CONTROL PLAN 18 <br />136 TC2-19 TRAFFIC CONTROL PLAN 19 <br />137 TC2-20 TRAFFIC CONTROL PLAN 20 <br />138 TC2-21 TRAFFIC CONTROL PLAN 21 <br />139 TC2-22 PEDESTRIAN DETOUR <br />140 TC2-23 W MARINE VIEW DRIVE CLOSURE DETOUR <br />141 TC2-24 W MARINE VIEW DRIVE CLOSURE DETOUR ENLARGEMENT <br />142 TC2-25 TRAFFIC CONTROL DETAILS <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.