Laserfiche WebLink
Surveyed By #### Date #### Control Monument #### City of Everett Field Book/Starting Page #### / ####Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\001 G\SHEETS\3815-02-G-2002.DWGPlot date 12/8/2025 9:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name EverettSheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />   <br />GENERAL <br />DRAWING INDEX <br />G-2002 <br />2 <br />K. WEBER <br />T. FRANKLIN <br />K. WEBER <br />SHEET INDEX <br />SHEET DRAWING TITLE <br />GENERAL <br />1 G-2001 COVER <br />2 G-2002 DRAWING INDEX <br />3 G-2011 LEGEND AND STANDARD ABBREVIATIONS <br />4 G-2012 GENERAL CONSTRUCTION NOTES <br />5 G-2013 NORTON TERMINAL UTILITY STRUCTURE LOADING CRITERIA <br />6 G-2014 NORTON TERMINAL TEMPORARY CONSTRUCTION ACCESS <br />7 G-2015 NORTON TERMINAL TCE ENLARGEMENT PLAN 1 <br />8 G-2016 NORTON TERMINAL TCE ENLARGEMENT PLAN 2 <br />SURVEY <br />9 V-2021 SURVEY CONTROLS 1 <br />10 V-2022 SURVEY CONTROLS 2 <br />DEMOLITION <br />11 CX-2001 NORTON TERMINAL IMPROVEMENT DEMOLITION - 1 <br />12 CX-2002 NORTON TERMINAL IMPROVEMENT DEMOLITION - 2 <br />13 CX-2011 NORTON TERMINAL PAVEMENT DEMOLITION - 1 <br />14 CX-2012 NORTON TERMINAL PAVEMENT DEMOLITION - 2 <br />15 CX-2021 NORTON TERMINAL PILE AND FOUNDATION DEMOLITION - 1 <br />16 CX-2022 NORTON TERMINAL PILE AND FOUNDATION DEMOLITION - 2 <br />CIVIL PLAN AND PROFILES <br />17 C-2030 SITE AND KEY PLAN <br />18 C-2031 SITE AND KEY PLAN <br />19 C-2032 SITE AND KEY PLAN <br />20 C-2033 SITE AND KEY PLAN <br />21 C-2034 SITE AND KEY PLAN <br />22 C-2060 UTILITY RELOCATION PLAN - 1 <br />23 C-2061 UTILITY RELOCATION PLAN - 2 <br />24 C-2062 UTILITY RELOCATION PLAN - 3 <br />25 C-2063 UTILITY RELOCATION PLAN - 4 <br />26 C-2064 UTILITY RELOCATION PLAN - 5 <br />27 C-2065 UTILITY RELOCATION PLAN - 6 <br />28 C-2066 UTILITY RELOCATION PLAN - 7 <br />29 C-2067 UTILITY RELOCATION PLAN - 8 <br />30 C-2068 UTILITY RELOCATION PLAN - 9 <br />31 C-2069 UTILITY RELOCATION PLAN - 10 <br />32 C-2106 WMVD - 48" CS PLAN AND PROFILE - STA 31+60 TO 36+60 <br />33 C-2107 WMVD - 48" CS PLAN AND PROFILE - STA 36+60 TO 40+40 <br />34 C-2108 LOWER NORTON AVE - 48" CS PLAN AND PROFILE - STA 40+40 TO 45+40 <br />35 C-2109 LOWER NORTON AVE - 48" - 30" CS PLAN AND PROFILE - STA 45+40 TO 50+40 <br />36 C-2110 LOWER NORTON AVE - 30" CS PLAN AND PROFILE - STA 50+40 TO 54+80 <br />37 C-2111 LOWER NORTON AVE - 30" CS PLAN AND PROFILE - STA 54+80 + 59+80 <br />38 C-2112 WMVD - 30" CS PLAN AND PROFILE - STA 59+80 TO 64+80 <br />39 C-2113 WMVD - 30" CS PLAN AND PROFILE - STA 64+80 TO 69+80 <br />40 C-2114 WMVD - 30" CS PLAN AND PROFILE - STA 69+80 TO 74+80 <br />41 C-2115 WMVD - 30" CS PLAN AND PROFILE - STA 74+80 TO 78+60 <br />42 C-2206 WMVD - 24" SS PLAN AND PROFILE - STA 9+80 TO 14+00 <br />43 C-2207 WMVD - 24" SS PLAN AND PROFILE - STA 14+00 TO 17+80 <br />44 C-2208 LOWER NORTON AVE - 24" SS PLAN AND PROFILE - STA 17+80 TO 22+80 <br />45 C-2209 LOWER NORTON AVE - 24" SS PLAN AND PROFILE - STA 22+80 TO 28+00 <br />46 C-2210 LOWER NORTON AVE - 20" SS PLAN AND PROFILE - STA 19+80 TO 23+20 <br />47 C-2211 LOWER NORTON AVE - 20" SS PLAN AND PROFILE - STA 23+20 TO 27+20 <br />48 C-2212 20TH STREET - 18" SS PLAN AND PROFILE - STA 27+20 TO 31+60 <br />49 C-2213 20TH STREET - 18" SS PLAN AND PROFILE - STA 31+60 TO 36+00 <br />50 C-2214 WMVD - 12" SS PLAN AND PROFILE - STA 19+80 TO 22+40 <br />51 C-2215 WMVD - 12" SS PLAN AND PROFILE - STA 22+40 TO 25+40 <br />52 C-2306 WMVD - 48" SD PLAN AND PROFILE - STA 21+60 TO 26+60 <br />53 C-2307 WMVD - 48" SD PLAN AND PROFILE - STA 26+60 TO 30+40 <br />54 C-2308 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 30+40 TO 35+40 <br />55 C-2309 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 35+40 TO 40+60 <br />56 C-2310 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 20+00 TO 24+40 <br />57 C-2311 LOWER NORTON AVE - 48" SD PLAN AND PROFILE - STA 24+40 TO 29+40 <br />58 C-2312 WMVD - 48" SD PLAN AND PROFILE - STA 29+40 TO 34+40 <br />59 C-2313 WMVD - 48" SD PLAN AND PROFILE - STA 34+40 TO 39+40 <br />60 C-2314 WMVD - 48" SD PLAN AND PROFILE - STA 39+40 TO 44+40 <br />61 C-2315 WMVD - 48" SD PLAN AND PROFILE - STA 44+40 TO 47+40 <br />62 C-2350 WMVD - EXPANDED VIEW AND STORM DRAIN PROFILES <br />63 C-2351 PGSF CONNECTION EXPANDED VIEWS - 1 <br />64 C-2352 PGSF CONNECTION EXPANDED VIEWS - 2 <br />65 C-2353 WMVD - DETENTION PIPE REPLACEMENT PROFILE <br />PAVEMENT RESTORATION <br />66 C-2401 WMVD AND LOWER NORTON AVE PLAN <br />67 C-2402 LOWER NORTON AVE PLAN <br />68 C-2403 WMVD AND LOWER NORTON AVE PLAN <br />69 C-2404 WMVD PLAN <br />70 C-2405 WMVD PLAN <br />71 C-2406 20TH STREET PLAN <br />TEMPORARY EROSION & SEDIMENT CONTROL <br />72 C-2501 WMVD AND LOWER NORTON AVE PLAN <br />73 C-2502 LOWER NORTON AVE PLAN <br />74 C-2503 LOWER NORTON AND WMVD PLAN <br />75 C-2504 WMVD PLAN <br />76 C-2505 WMVD PLAN <br />77 C-2506 20TH ST PLAN <br />CIVIL DETAILS <br />78 CD-2601 PRESSURE MH ACCESS STRUCTURES <br />79 CD-2602 TRENCH DETAILS <br />80 CD-2603 FLOW METER VAULT <br />81 CD-2604 EXISTING TRANSITION STRUCTURE <br />82 CD-2605 TRANSITION STRUCTURE <br />83 CD-2606 STANDPIPE DETAILS <br />84 CD-2607 STANDPIPE DETAILS <br />85 CD-2608 TRENCH AND PAVEMENT RESTORATION DETAILS <br />86 CD-2609 PIPING SECTIONS <br />87 CD-2610 PIPING SECTIONS <br />88 CD-2611 TESC DETAILS <br />89 CD-2612 STRUCTURE ENLARGEMENT PLANS <br />90 CD-2613 SECURITY FENCING DETAILS <br />TRENCHLESS WORK <br />91 C-2801 BNSF CROSSING PLAN <br />92 C-2802 BNSF CROSSING PROFILE 48" SEWER <br />93 C-2803 BNSF CROSSING PROFILE 48" STORM <br />94 C-2804 BNSF CROSSING PROFILE 24" SEWER <br />95 C-2805 BNSF CROSSING CASING DETAILS <br />STORMWATER TREATMENT <br />96 C-5001 PGSF STORMWATER TREATMENT PLAN <br />97 C-5002 PGSF STORMWATER TREATMENT SECTIONS <br />STANDARD DETAILS <br />98 CD-4001 STANDARD DETAILS STD DETAIL 201, 210, 212, 214 <br />99 CD-4002 STANDARD DETAILS STD DETAIL 302, 303, 305, 307 <br />100 CD-4003 STANDARD DETAILS STD DETAIL 312, 326, 401, 402 <br />101 CD-4004 STANDARD DETAILS STD DETAIL 405, 412, 511, 515 <br />102 CD-4005 STANDARD DETAILS STD DETAIL 505, 604, 605 <br />103 CD-4006 STANDARD DETAILS STD DETAIL 606, 607, 608, 609 <br />104 CD-4007 STANDARD DETAILS STD DETAIL 610, 611, 612, 614 <br />105 CD-4008 STANDARD DETAILS STD DETAIL 615, 616, 618 <br />STRUCTURAL <br />106 S-2604 TRANSITION STRUCTURE PLANS <br />107 S-2605 TRANSITION STRUCTURE SECTIONS <br />108 S-2606 STANDPIPE SUPPORT PLAN AND ELEVATIONS <br />109 S-2607 STANDPIPE SUPPORT DETAILS <br />110 S-4001 STRUCTURAL GENERAL NOTES <br />111 S-4002 STRUCTURAL SPECIAL INSPECTIONS <br />112 S-4003 STANDARD DETAILS 1 <br />113 S-4004 STANDARD DETAILS 2 <br />114 S-4005 STANDARD DETAILS 3 <br />115 S-4006 STANDARD DETAILS 4 <br />ELECTRICAL DEMOLITION <br />116 EX-2001 NORTON TERMINAL IMPROVEMENT DEMOLITION <br />TRAFFIC CONTROL <br />117 TC2-1 TRAFFIC CONTROL PLAN 1 <br />118 TC2-2 TRAFFIC CONTROL PLAN 2 <br />119 TC2-3 TRAFFIC CONTROL PLAN 3 <br />120 TC2-4 TRAFFIC CONTROL PLAN 4 <br />121 TC2-5A TRAFFIC CONTROL PLAN 5A <br />122 TC2-5B TRAFFIC CONTROL PLAN 5B <br />123 TC2-6 TRAFFIC CONTROL PLAN 6 <br />124 TC2-7 TRAFFIC CONTROL PLAN 7 <br />125 TC2-8 TRAFFIC CONTROL PLAN 8 <br />126 TC2-9 TRAFFIC CONTROL PLAN 9 <br />127 TC2-10 TRAFFIC CONTROL PLAN 10 <br />128 TC2-11 TRAFFIC CONTROL PLAN 11 <br />129 TC2-12 TRAFFIC CONTROL PLAN 12 <br />130 TC2-13 TRAFFIC CONTROL PLAN 13 <br />131 TC2-14 TRAFFIC CONTROL PLAN 14 <br />132 TC2-15 TRAFFIC CONTROL PLAN 15 <br />133 TC2-16 TRAFFIC CONTROL PLAN 16 <br />134 TC2-17 TRAFFIC CONTROL PLAN 17 <br />135 TC2-18 TRAFFIC CONTROL PLAN 18 <br />136 TC2-19 TRAFFIC CONTROL PLAN 19 <br />137 TC2-20 TRAFFIC CONTROL PLAN 20 <br />138 TC2-21 TRAFFIC CONTROL PLAN 21 <br />139 TC2-22 PEDESTRIAN DETOUR <br />140 TC2-23 W MARINE VIEW DRIVE CLOSURE DETOUR <br />141 TC2-24 W MARINE VIEW DRIVE CLOSURE DETOUR ENLARGEMENT <br />142 TC2-25 TRAFFIC CONTROL DETAILS <br />12/09/2025