My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />45+40 45+60 45+80 46+00 46+20 46+40 46+60 46+80 47+00 47+20 47+40 47+60 47+80 48+00 48+20 48+40 48+60 48+80 49+00 49+20 49+40 49+60 49+80 50+00 50+20 50+40 <br />48" SS 181.35LF @ 0.40%48" SS 181.35LF @ 0.40%48" SDSTA. 49+45.09IE=3.48±STA. 49+29.65IE = -1.0430" CS 10.16LF @ 0.00% <br />48" SS 11.75LF <br />@ 0.40% <br />EXISTING GROUND <br />12" SS CONCSTA. 49+22.37IE=6.82±30" CS 12.64LF <br />@ 0.25% <br />30" CS 56.81LF @ 0.25%24" SSSTA. 49+65.77IE=3.63±1.96' CLEAR30" CS 135.53LF @ 0.25%30"x16" TEESTA. 49+99.10IE = -0.8730" SS 150.01LF @ 0.40%SSMH 01172" TYPE 3MODIFIED W/ENCASEMENTRIM=17.8848" SS 23.77LF @ 0.40%48" TEESTA. 46+96.37IE = 4.5548"X30" ECC REDUCERSTA. 47+08.12IE = 4.5048" SS 16.65LF <br />@ 0.40% <br />30" CS 13.66LF <br />@ 0.00%STA. 49+05.83IE = -1.0430" <br />S <br />S <br /> <br />4 <br />7 <br />. <br />7 <br />1 <br />L <br />F <br /> <br />@ <br /> <br />1 <br />0 <br />. <br />3 <br />6 <br />%STA. 48+58.12IE = 3.901CD-2601STA. 46+79.72IE = 4.621.77' CLEAR6" HPGSTA. 50+16.35IE=13.40±STA. 49+86.46IE = -0.90ACCESSWAYSTA. 46+55.95IE = 4.7112" SS CONCSTA. 49+22.37IE=6.82±12" SS CONCSTA. 50+10.68IE=6.49±30"x24" TEESTA. 49+19.49TRENCH PER DETAIL A/CD-2602 <br />AND SECTION 31 23 00 <br />APPROX TRENCH <br />CUT-OFF WALL (TYP) <br />2 <br />CD-2608 <br />1 <br />7 <br />1 <br />4 <br />4 4 4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 4 <br />4 <br />4 <br />1 <br />1 COCSVT-30-01 <br />CSVT-10-01 <br />AREA 15 <br />COMBINED SEWER INFLUENT <br />101102 <br />106 <br />112 <br />118 <br />500 <br />29051900201500 <br />UNKNOWN <br />29051900201300 <br />2600 FEDERAL AVE <br />EASEMENT AFN 201907310975 <br />XXXXXXXXXXXXXX46+0047+0048+0049+0050+0050+4048" SS <br />30" SS <br />19 <br />18 <br />19 <br />18 <br />20 <br />21 1817 <br />19 <br />#14 #13 <br />HWA-19P-24 <br /> HWA-20P-24 <br /> <br />POTHOLE APS PH 19 <br />GROUND COMM EL=17.9 <br />TOP OF COMM PIPE=14.9EX 12" SS CONC <br />48" CS HDPE WO UP3525 <br />(BY OTHERS) <br />EX 16" W DIP <br />EX 6" HPG <br />4 <br />END CO19 <br />STA. 47+08.12 <br />N:363472.74, E:1302219.78 <br />Δ <br />STA. 49+19.49 <br />N:363681.67, E:1302251.86 <br />Δ <br />G <br />CD-2605 <br />N:363684.33, E:1302208.21 <br />END OF WO UP3815-02 <br />SEE SHEET C-2351 FOR PLANT <br />CONNECTION EXPANDED VIEW <br />SEE SHEET C-2351 FOR <br />PLANT CONNECTION <br />EXPANDED VIEW <br />2 <br />C-2351 <br />11 <br />7 <br />30" CS <br />SEE SHEET C-2352 FOR <br />PLANT CONNECTION <br />EXPANDED VIEW <br />3 <br />C-2352 <br />CO28 <br />CO20 <br />CO01 <br />7 <br />11 <br />11 <br />7 <br />EX 32" SS PEP <br />IE = -56.0± <br />EX 32" SS PEP <br />IE = -52.7± <br />CSVT 10-02 <br />WATER METER VAULT <br />24" CS HDPE <br />WO UP3525 <br />(BY OTHERS) <br />SSMH 011, STA. 46+55.95 <br />N:363421.36, E:1302210.84 <br />Δ 0° 00' 00" HORIZ <br />1 <br />CD-2601 <br />PORT OF EVERETT <br />NORTON TERMINAL <br />EX 12" SS CONC 7 <br />48" SS <br />STA. 46+79.72 <br />N:363444.67, E:1302215.47 <br />Δ 2° 30' 55" HORIZ <br />PGSF <br />WO# UP-3523 <br />LOWER NORTON AVENUE15 <br />N:363752.81, E:1302205.02 <br />END OF WO UP3815-02 <br />WO UP3525 <br />(BY OTHERS) <br />0° 00' 00" HORIZ <br />STA. 49+86.46 <br />N:363747.86, E:1302262.02 <br />Δ <br />48" TEE CO19 <br />STA. 46+96.37 <br />N:363461.13, E:1302218.00 <br />Δ 0° 00' 00" HORIZ <br />SNOPUD TRANSMISSION <br />POLES AND ANCHORS <br />SEE GENERAL NOTE 2. <br />N:363464.96, E:1302193.08 <br />EX 48" BLIND FLANGE <br />1 <br />C-2351 <br />4 <br />16" SS WO UP3525 <br />CSVT-10-01 (BY OTHERS) <br />STA. 49+99.10 <br />N:363760.12, E:1302258.96 <br />Δ 0° 00' 00" HORIZ <br />EX 12" SS CONC <br />24 <br />4 <br />4 <br />23 <br />TCE AREA 2 <br />PE AREA 5 <br />0° 00' 00" HORIZ <br />22° 45' 23" HORIZ <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2109.DWGPlot date 12/8/2025 11:17 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />COMBINED SEWER <br />LOWER NORTON AVE - 48" SS - 30" SS <br />PLAN AND PROFILE - STA 45+40 TO 50+40 <br />C-2109 <br />35 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 45+40SEE DRAWING C-2108GENERAL NOTES <br />KEY NOTES <br />MATCHLINE STA 50+40SEE DRAWING C-21101 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />4 PROVIDE SHOP FABRICATED FRP FITTING PER SECTION <br />33 05 36. RESTRAIN JOINTS AS SPECIFIED. <br />7 ABANDON EXISTING PIPE IN PLACE. REMOVE <br />INTERFERING PIPE OR STRUCTURES AS REQUIRED TO <br />COMPLETE THE WORK. PRESSURE GROUT PIPE CUT <br />AND CAP PIPE WITH CONCRETE PLUGS. PLUGS SHALL <br />BE CLASS B CONCRETE, MINIMUM ONE-DIAMETER IN <br />LENGTH INTO THE PIPE. <br />11 CONNECT TO PLANT PIPING. FIELD VERIFY LOCATION, <br />ELEVATION AND CONDITION OF CONNECTION POINT. <br />COORDINATE INSTALLATION AND SCHEDULE WITH <br />CITY. <br />15 RELOCATE EX WATER LINE. MAINTAIN SERVICE <br />DURING CONSTRUCTION. <br />23 SHEET PILE WALL BY WO# UP3525. LOCATE EXISTING <br />SHEET PILE WALL (APPROXIMATE LOCATION SHOWN) <br />REMOVE PORTIONS OF THE SHEET PILE WALL AS <br />REQUIRED TO CONNECT TO PGSF PIPE. <br />24 MANHOLE TO BE SUPPORTED ON PILES PER S-4006 <br />AND SECTION 31 63 33. <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST <br />BE PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. <br />3.LIMITS OF STEEL PILES AND REINFORCED CONCRETE <br />FOUNDATIONS ARE SHOWN BASED ON BEST <br />AVAILABLE RECORD INFORMATION. EXISTING <br />FOUNDATION DEMOLITION SHALL BE PERFORMED <br />AS REQUIRED TO COMPLETE THE WORK. <br />4.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD-2608. <br />10 402020FEET0 <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVEKnow what's below. <br />before you dig.Call <br />R <br />24TH STREET <br />25TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.