My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />-10 <br />-5 <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />50+40 50+60 50+80 51+00 51+20 51+40 51+60 51+80 52+00 52+20 52+40 52+60 52+80 53+00 53+20 53+40 53+60 53+80 54+00 54+20 54+40 54+60 54+80 <br />30" CS 676.49LF @ 0.25%4" NGASSTA. 53+99.21TOP=14.0±36" SDSTA. 53+12.56IE=9.28±STA. 51+48.26IE = -0.4912" SS FM <br />24" CASEMENT <br />EX METER <br />VAULT <br />12" W CISTA. 54+39.41IE=UNKNOWN6" DI W TELECOM DUCT BANKSTA. 52+05.36TOP=12.5±EX SSMHRIM=16.7030" CS 135.53LF @ 0.25%SSMH 20060" TYPE 3 MODIFIEDRIM=15.55ACCESSWAY30x30x30 TEESTA. 51+34.63IE = -0.53EXISTING GROUND <br />CO038" SSSTA. 50+61.31IE=6.70±8" SSSTA. 50+55.62IE=7.00±12" SDSTA. 54+67.87IE=11.90±1CD-2601TRENCH PER DETAIL C/CD-2602 <br />AND SECTION 31 23 00 <br />TRENCH PER COE DETAIL 614 MOD <br />AND SECTION 31 23 00 <br />TRENCH PER DETAIL E/CD-2602 <br />AND SECTION 31 23 00 <br />STA 51+75.95TOP EL = 13.17ELECTRICAL DUCTBANKAPPROX TRENCH <br />CUT-OFF WALL (TYP) <br />2 <br />CD-2608 <br />30" CS 13.64LF @ 0.25%STA. 52+21.89START CO03 ABOVE3 <br />1 <br />1 <br />1 <br />4PLPLPLPLPLPLPLPLPLPLPLPL105 <br />123124125 <br />126 <br />227 <br />29051900201900 <br />UNKNOWN <br />LOWER NORTON AVE <br />2 <br />5 <br />A <br />CD-2610 <br />50+4051+0052+0053+0054+0030" CS <br />WEST MARINE VIEW DRIVE OVERHEAD <br />EX 16" W DIP <br />POTHOLE APS PH 20 <br />GROUND COMM EL=15.8 <br />TOP OF COMM=12.5 <br />16 <br />17 <br />17 <br />1817 <br />1617171816 <br />16 <br />16EX 12" SS CONC ABAND <br />EX 4" NGAS <br />POTHOLE APS PH 21 <br />GROUND 4" NGAS EL=18.0 <br />TOP OF 4" NGAS=14.0 <br />EX 12" W CI EX 16" W DIP <br />EX 6" HPG <br />EX 12" SD DIP <br />STA. 51+48.26 <br />N:363904.84, E:1302222.81 <br />Δ <br />CO01 <br />CO03 (ABOVE) <br />CO01 <br />CO02 <br />CO02 <br />30" CS <br />1 <br />CD-2601 <br />7 <br />77 <br />4 <br />WO UP3525 <br />(BY OTHERS) <br />EX 12" DI FM10 <br />SEE DRAWING <br />C-2064 FOR UTILITY <br />RELOCATION PLAN <br />ELECTRICAL DUCTBANK <br />(BY OTHERS) <br />22° 53' 35" HORIZ <br />SSMH 200, TYPE 3 MODIFIED <br />STA. 51+34.63 <br />N:363891.61, E:1302226.11 <br />Δ 0° 00' 00" HORIZ <br />16 <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2110.DWGPlot date 12/8/2025 10:49 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />COMBINED SEWER <br />LOWER NORTON AVE - 30" CS <br />PLAN AND PROFILE - STA 50+40 TO 54+80 <br />C-2110 <br />36 <br />B. O'NEILL <br />T. FRANKLIN <br />K. WEBER <br />PROFILE <br />SCALE: HORIZ: 1"=20' VERT:1"=5' <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br /> MATCHLINE STA 54+80 SEE DRAWING C-2111GENERAL NOTES <br />KEY NOTES <br />1 PROVIDE SN72 PN50 FRP PIPE PER SECTION 33 05 36. <br />ALL JOINTS TO BE RESTRAINED WHERE SPECIFIED. <br />2 METER, VAULT AND ASSOCIATED APPURTENANCES <br />TO BE REMOVED. SALVAGE ANY MATERIAL PER <br />SECTION 02 41 00. REMOVE AND REPLACE 12" DI FM <br />TO EXTENTS SHOWN ON SHEET C-2064. SEE DETAIL 1 <br />SHEET CD-2603. <br />3 EXISTING STORM SYSTEM INCLUDING DETENTION <br />PIPES TO BE REMOVED FOR INSTALLATION OF <br />LARGER, DEEPER PIPES. REPLACE LOCAL STORM <br />COLLECTION WITH 12" PIPES AND CATCH BASINS. SEE <br />SHEET C-2353 FOR STORM PIPE. <br />4 PROVIDE SHOP FABRICATED FRP FITTING PER <br />SECTION 33 05 36. RESTRAIN JOINTS AS SPECIFIED. <br />5 SEWER STRUCTURE AND 4 CONNECTING SEWER <br />PIPES TO BE ABANDONED AFTER SUBSTANTIAL <br />COMPLETION OF LIFT STATION 46, ESTIMATED <br />SUMMER 2026. REMOVE CONFLICTING SEWER PIPES <br />AS NEEDED AND MAINTAIN ALL SEWER SERVICE <br />FLOWS WITH TEMPORARY AND/OR BYPASS SEWER <br />LINES. <br />7 ABANDON EXISTING PIPE IN PLACE. REMOVE <br />INTERFERING PIPE OR STRUCTURES AS REQUIRED TO <br />COMPLETE THE WORK. PRESSURE GROUT PIPE CUT <br />PER 02 41 00 AND CAP PIPE WITH CONCRETE PLUGS. <br />PLUGS SHALL BE CLASS B CONCRETE, MINIMUM <br />ONE-DIAMETER IN LENGTH INTO THE PIPE. <br />10 PROVIDE BYPASS PUMPING PER SECTION 33 01 30.50 <br />AS REQUIRED TO COMPLETE THE WORK. <br />11 CONNECT TO PLANT PIPING. FIELD VERIFY LOCATION, <br />ELEVATION AND CONDITION OF CONNECTION POINT. <br />COORDINATE INSTALLATION AND SCHEDULE WITH <br />CITY. <br />16 PROVIDE 60” TYPE 3 MANHOLE PER COE STD DETAIL <br />607 WITH CAST IN PLACE BASE. MANHOLE TO BE <br />SUPPORTED ON PILES PER SECTION 31 63 33. <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.SEE GENERAL NOTES G-3012 FOR ADDITIONAL <br />INFORMATION. <br />3.PROVIDE TRENCH CUT OFF WALL WHERE <br />GROUNDWATER IS PRESENT PER DETAIL 2/CD-2608.MATCHLINE STA 50+40SEE DRAWING C-21090 FEET20 20 4010 <br />Know what's below. <br />before you dig.Call <br />R <br />KEY MAP <br />SCALE: NTS <br />WEST MARINE VIEW DRIVE20TH STREETRUCKER AVEGRAND AVE25TH STREET <br />24TH STREET <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.