Laserfiche WebLink
GENERAL NOTES <br />1.ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND <br />CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD <br />SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT <br />EDITION). <br />2.EXISTING PLANT SITE CONDITIONS ARE BASED ON SURVEY INFORMATION PROVIDED BY <br />1-ALLIANCE, INC (DATED 21 NOV 2022), SUPPLEMENTAL INFORMATION PROVIDED BY <br />1-ALLIANCE, INC (DATED 02 APR 2024). EXISTING CONDITIONS HAVE BEEN UPDATED TO <br />REFLECT WORK DONE DURING PORT GARDNER WET WEATHER STORAGE FACILITY <br />PACKAGE CONTRACT. <br />UTILITY GENERAL NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN HEREIN ARE APPROXIMATE LOCATIONS <br />ONLY BASED ON THE FIELD LOCATION OF UTILITY LOCATE PAINT MARKS AND PHYSICAL <br />FEATURES VISIBLE ON OR ABOVE THE GROUND SURFACE. THE CONTRACTOR SHALL <br />DETERMINE THE LOCATION OF ANY AND ALL UNDERGROUND UTILITIES BEFORE <br />BEGINNING WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL <br />DAMAGES ARISING OUT OF THEIR FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO <br />AVOID DAMAGE TO ANY UTILITIES. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND <br />ANY MODIFIED WORK REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO <br />COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />3.EXISTING CITY WATER MAIN ELEVATION ASSUMED TO BE 4' BELOW GROUND SURFACE <br />(BGS). <br />4.EXISTING NGAS ELEVATIONS ASSUMED TO BE 3' BELOW GROUND SURFACE (BGS). <br />5.EXISTING POWER AND COMMUNICATIONS UTILITIES ASSUMED TO BE 2' BELOW GROUND <br />SURFACE (BGS). <br />WATER GENERAL NOTES <br />1.NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN <br />APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, <br />TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST <br />RESULTS. DISINFECT WATER MAIN PER WSDOT STANDARD SPECIFICATIONS 7-09.3(24). <br />2.CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS <br />DEPARTMENT. THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS <br />DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL <br />THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE <br />MADE. <br />3.THE PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED OF A PERSON WHO CAN BE <br />CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. <br />4.MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION <br />BETWEEN POTABLE AND NON-POTABLE CONVEYANCE SYSTEMS. ENCASE WATER MAIN IN <br />CONTROLLED DENSITY FILL (CDF) AT LOCATIONS INDICATED IN THE DRAWINGS WHEN <br />THESE MINIMUM SEPARATION DISTANCES ARE LESS THAN SPECIFIED. <br />5.ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT <br />PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />SANITARY SEWER GENERAL NOTES <br />1.REQUIREMENTS FOR SANITARY SEWER SHALL APPLY TO BOTH SANITARY SEWER (SS) AND <br />COMBINED SEWERS (CS). <br />2.NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED, OR PUT <br />INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, AND APPROVED BY THE CITY <br />INSPECTOR. <br />3.ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS <br />MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />STORM DRAINAGE GENERAL NOTES <br />1.NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE <br />UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY INSPECTOR. <br />2.ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE <br />STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION <br />ENVIRONMENTAL PROTECTION <br />1.NO CONSTRUCTION RELATED ACTIVITY SHALL CONTRIBUTE TO THE DEGRADATION OF THE <br />ENVIRONMENT, ALLOW MATERIAL TO ENTER SURFACE OR GROUND WATERS, OR ALLOW <br />PARTICULATE EMISSIONS TO THE ATMOSPHERE, WHICH EXCEED STATE OR FEDERAL <br />STANDARDS. ANY ACTIONS THAT POTENTIALLY ALLOW A DISCHARGE TO STATE WATERS <br />MUST HAVE PRIOR APPROVAL OF THE WASHINGTON STATE DEPARTMENT OF ECOLOGY. <br />HIGHLINING (WATER) <br />1.MAINTAIN POTABLE WATER SERVICE AT ALL TIMES. SUBMIT A DETAILED SEQUENCING <br />PLAN FOR MAINTENANCE OF SERVICE, HIGHLINING, REALIGNMENT OF FACILITIES DUE TO <br />CONFLICT AND DEMOLITION OF FACILITIES AS REQUIRED TO COMPLETE THE WORK. <br />2.TEMPORARY SERVICE INTERRUPTIONS MUST BE COORDINATED AND ACCEPTED BY THE <br />CITY/UTILITY OWNER. SEE ADDITIONAL REQUIREMENTS IN SECTION 02 01 10 EXISTING <br />UTILITIES: COORDINATION AND RELOCATION AND SECTION 02 01 20 PROTECTING <br />EXISTING UTILITIES. <br />PERMITS AND NOTIFICATION NOTES <br />1.THE CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS PRIOR TO BEGINNING <br />CONSTRUCTION. <br />2.THE CONTRACTOR SHALL NOTIFY THE CITY FORTY-EIGHT (48) HOURS PRIOR TO <br />COMMENCING PERMITTED WORK, TWENTY-FOUR (24) HOURS PRIOR TO ANY REQUIRED <br />INSPECTION, AND AFTER COMPLETING WORK COVERED BY THE PERMIT. <br />3.THE CONTRACTOR SHALL ABIDE BY ALL AGREEMENTS BETWEEN THE CITY AND EASEMENT <br />OWNERS INCLUDING BUT NOT LIMITED TO WSDOT, BNSF, AND THE PORT AUTHORITY. <br />4.THE CONTRACTOR SHALL COMPLY WITH ALL PERMITTING REGULATIONS, SAFETY <br />REGULATIONS, REQUIREMENTS, NOTIFICATION / INSPECTION REQUIREMENTS, <br />MEETINGS, AND TO PROVIDE ALL INFORMATION REQUIRED BY THE PERMIT. <br />EX UTILITIES - WMVD-WORK ORDER 3815-02 <br />1.KIMBERLY CLARK CML STL PIPE REPURPOSING. ATTACHMENT G IS PROVIDED FOR THE <br />CONTRACTOR'S REVIEW. <br />a.EX 30" W - THE EXISTING 30" DIAMETER STEEL PIPE INSTALLED IN 1930, CEMENT <br />MORTAR LINED IN 1975. ABANDONED - OUT OF SERVICE. COAL TAR COATING. <br />2.LOCATION AND DEPTH OF EXISTING STL PIPE IS APPROXIMATE. FIELD VERIFY LOCATION <br />AND DEPTH PRIOR TO PROCUREMENT OF MATERIALS. PROVIDE INFORMATION TO THE <br />CONSTRUCTION MANAGER FOR REVIEW. <br />BYPASS NOTES <br />1.THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF ALL PUMP EQUIPMENT, PIPING, <br />POWER, COLLECTION, AND DISTRIBUTION ELEMENTS TO ACHIEVE THE BYPASSING OF <br />EXISTING SANITARY SEWER OR COMBINED SEWERS FROM INTAKE POINT TO DISCHARGE <br />POINT. THE QUANTITY OF SEWAGE TO BE BYPASSED FROM POINT TO POINT SHALL BE <br />THE SUM OF ALL FLOWS ENTERING THE PIPELINE BEFORE THE POINT OF DISCHARGE. <br />2.SUBMIT A DETAILED BYPASS PLAN PER SPECIFICATION SECTION 33 01 30.50. <br />3.BYPASS EQUIPMENT STAGING AND PIPING SHALL BE INCLUDED AS PART OF THE <br />CONTRACTOR'S TRAFFIC CONTROL PLAN (TCP). THE TCP SHALL BE SUBMITTED TO THE <br />AGENCY WITH JURISDICTION OVER THE RIGHTS-OF-WAY FOR APPROVAL. <br />4.CONTRACTOR SHALL COMPLY WITH TCP REQUIREMENTS AS APPROVED BY AGENCY WITH <br />JURISDICTION OVER THE RIGHTS-OF-WAY. <br />5.CONTRACTOR SHALL BURY BYPASS PIPING PERPENDICULAR TO TRAFFIC WHEN CROSSING <br />ROADWAYS AND WHERE REQUIRED BY THE AGENCY WITH JURISDICTION OVER THE <br />RIGHTS-OF-WAY GOVERNING AGENCY. CONTRACTOR MUST INCLUDE ALL COSTS FOR <br />SUBSURFACE UTILITY EXPLORATION REQUIRED TO ROUTE BURIED PIPING AS PART OF <br />THEIR BID PRICE. <br />6.DRIVEWAY ACCESS SHALL BE MAINTAINED AND ACCESSIBLE TO THE PUBLIC AND FIRE <br />AND EMERGENCY VEHICLES UNLESS OTHERWISE NOTED ON PLANS. CROSSINGS SHALL BE <br />BURIED PERPENDICULAR TO ROADWAYS OR CROSSED WITH ACCEPTED TEMPORARY <br />ROAD RAMPS. <br />7.ADA COMPLIANT PEDESTRIAN ACCESS SHALL BE MAINTAINED TO SIDEWALKS, BRIDGE <br />CROSSINGS AND TRAILS. <br />8.CONTRACTOR SHALL USE MANHOLES FOR SUCTION AND DISCHARGE AND WILL NOT BE <br />ALLOWED TO CUT PIPELINES FOR SUCTION OR DISCHARGE. <br />9.SEE SPECIFICATION SECTION 33 01 30.50 FOR REQUIREMENTS ON SEWER SERVICE, <br />PRIVATE PROPERTY ACCESS, AND COORDINATION REQUIREMENTS. <br />GENERAL TESC NOTES <br />1.APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT <br />CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G., SIZE AND <br />LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS,RETENTION FACILITIES, UTILITIES). <br />2.THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED <br />AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3.THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, <br />NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE <br />FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />4.THE ESC FACILITIES SHOWN ON THIS PLAN SHALL BE CONSTRUCTED IN CONJUNCTION <br />WITH ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH A MANNER AS TO ENSURE <br />THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5.THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br />ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. <br />6.THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY <br />AFTER STORM EVENTS. <br />7.THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM <br />EVENT. <br />8.AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE <br />WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE <br />CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT - <br />LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br />THE DURATION OF THE PROJECT. <br />10.THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />SEDIMENT TRACKED OFF THE SITE. <br />11.APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br />WATER BODIES IF THE PROPOSED BEST MANAGEMENT PRACTICES (BMPS) FAIL. IF BMPS <br />FAIL AND SEDIMENT-LADEN WATER IS LEAVING THE SITE, IMMEDIATELY NOTIFY YOUR <br />PUBLIC WORKS INSPECTOR. <br />12.BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR <br />NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND FOR NO MORE THAN <br />7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />13.NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING <br />ACTIVITIES. HANDLE HIGHLY TURBID OR OTHERWISE CONTAMINATED DEWATERING <br />WATER SEPARATELY FROM STORMWATER. <br />14.THE APPROVED PROJECT PUBLIC WORKS PERMIT AND STORMWATER POLLUTION <br />PREVENTION PLAN (SWPPP) SHALL BE RETAINED ON SITE OR READILY AVAILABLE TO THE <br />CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT. <br />15.DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION <br />MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS. <br />16.PROTECT ALL LOW IMPACT DEVELOPMENT(L.I.D.) BMPS FROM SEDIMENTATION <br />THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL <br />BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO THE L.I.D. BMPS <br />Surveyed By #### Date #### Control Monument #### City of Everett Field Book/Starting Page #### / ####Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\001 G\SHEETS\3815-02-G-2012.DWGPlot date 12/8/2025 9:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name EverettSheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />   <br />GENERAL <br />GENERAL CONSTRUCTION NOTES <br />G-2012 <br />4 <br />K. WEBER, R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />12/09/2025