My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> Addendum 2 Page 1 <br />CITY OF EVERETT 3200 Cedar Street Everett, WA 98201 (425) 257-8800 Fax (425) 257-8882 <br /> <br /> <br /> <br /> <br /> <br /> <br />ADDENDUM NO. 2 TO <br />PORT GARDNER STORAGE FACILITY WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER – CONSTRUCTION PACKAGE 2 <br />WO# UP3815-02 <br />JANUARY 28, 2026 <br /> <br />NOTICE TO PLANHOLDERS <br />Addendum No. 2 contains the following revisions, additions, deletions and clarifications <br />and is hereby made a part of the contract documents for the above-named Project and <br />shall be considered by all prospective bidders in submitting bids. <br /> <br />Bidders must acknowledge receipt of Addendum No. 2 in the space provided on page <br />00 41 13 - 5 in the Bid Form. Failure to comply with this requirement may render the <br />Bid non-responsive and may cause its rejection. <br /> <br />This Addendum No. 2 consists of 4 revised specification section(s), 4 revised plan <br />sheets and responses to 3 questions received from prospective bidders. This <br />Addendum No. 2 includes all revisions, attachments, and details. <br /> <br />The Bid date for receipt of Bids is changed to February 24, 2026 by <br />this Addendum. <br /> <br />SPECIFICATIONS, PLANS, AND CONTRACT DOCUMENTS <br />Item 1 - VOLUME 4 ATTACHMENTS: <br />Add Attachment Q “Port of Everett License Agreement.” <br />Item 2 - VOLUME 4 ATTACHMENTS: <br /> Replace Attachment O “PSE Relocation 60%” with updated version. <br />Item 3 - SECTION 00 11 13 ADVERTISMENT FOR BIDS: <br />Change date for receipt of bids to Tuesday, February 24, 2026.
The URL can be used to link to this page
Your browser does not support the video tag.