My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> Addendum 2 Page 2 <br />CITY OF EVERETT 3200 Cedar Street Everett, WA 98201 (425) 257-8800 Fax (425) 257-8882 <br /> <br />Item 4 - SECTION 00 22 13 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS: <br /> Replace Section 00 22 13 with updated version, attached. <br />Item 5 - SECTION 00 25 13 PRE-BID MEETING <br /> Add Paragraph 1.2.C as follows: <br /> “Meeting 3 – 2:00 PM, TUESDAY, FEBRUARY 3, 2026.” <br /> Add Paragraph 1.4.C as follows: <br /> “On FEBRUARY 3, 2026, the meeting/site visit will start promptly at 2:00 PM.” <br />Item 6 - SECTION 00 45 13 BIDDER QUALIFICATION STATEMENT: <br /> Replace Section 00 45 13 with updated version, attached. <br />Item 7 - SECTION 01 22 13 MEASUREMENT AND PAYMENT: <br /> Replace Paragraph 1.9.S with the following: <br /> “Measurement for Norton Terminal Removal of Structures and Obstructions <br />will be based on the tonnage, removed and disposed of existing <br />pavements, reinforced concrete foundations and abandoned piping and <br />structures buried below grade within the excavation limits. <br /> Payment shall be made at the unit price per ton for which price shall <br />constitute full compensation for excavation, demolition, removal and <br />disposal of existing pavements, concrete reinforced foundations, and <br />demolition of existing, abandoned piping and oth er requirements of Section <br />01 12 16, Work Sequence and Section 02 41 00, Demolition.” <br />Item 8 - SECTION 01 33 00 SUBMITTAL PROCEDURE: <br /> Replace Paragraph 3.2.B with the following: <br /> “The City’s Construction Manager will provide the Document Control System, <br />Autodesk Construction Cloud (ACC), and will provide up to 5 licenses to the <br />Contractor. The Contractor is required to utilize this system for all document <br />control and electronically submit, including, but not limited to, submittals, <br />RFIs, correspondence and project documentation.” <br />Item 9 - SECTION 01 50 00 TEMPORARY FACILITIES AND ENVIRONMENTAL <br />CONTROLS: <br /> Replace Paragraph 1.2.K.2.c with the following: <br />“Provide 1 business quality, multi-function printer/copier/scanner capable of <br />40ppm, double sided, color, paper size up to 11x17. Also provide
The URL can be used to link to this page
Your browser does not support the video tag.