KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 22 13 - 1 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 22 13 - 1 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />SECTION 00 22 13 <br />SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />PART 1 - GENERAL <br />1.1 GENERAL <br />A. It is the intent of City to award a contract to the lowest responsive and responsible <br />Bidder. Before award, the Bidder must also meet the supplemental bidder responsibility <br />criteria listed below. Further, the apparent low Bidder and second apparent low bidder <br />must submit the Bidder Qualification Statement (Section 00 45 13) and any other <br />documentation listed below to the City within one business day after the bid opening, <br />unless the City’s project manager, in writing, allows additional time. The City reserves <br />the right to require such documentation from other bidders also. <br />1.2 SUPPLEMENTAL RESPONSIBILITY CRITERIA <br />A. Experience <br />1. Criteria: The Bidder must satisfy criteria a, b, and c below: <br />a. The Bidder must have successfully completed at minimum all of the following <br />within ten (10) years prior to bid opening: <br />(1) Three projects involving the construction of at least 1,000 continuous <br />linear feet of buried stormwater or municipal wastewater pipeline having a <br />minimum diameter of 30 inches and reaching a depth of at least 15 feet <br />for the invert elevation for portions of the pipeline. This construction may <br />have been by Bidder’s own forces or by subcontractor(s). Three separate <br />Bidder projects must be used to satisfy this requirement. <br />(2) Three trenchless pipeline installations using pipe ramming, jacking, or <br />microtunneling methods for stormwater or municipal wastewater <br />conveyance pipelines with a carrier pipe diameter of at least 30 inches. <br />This construction may have been by Bidder’s own forces or by <br />subcontractor(s). At least two separate Bidder projects must be used to <br />satisfy this requirement. <br />Alternative. If the Bidder does not have trenchless pipeline <br />installation projects to satisfy the preceding requirement, then <br />Bidder may alternatively satisfy requirement (2) if the Bidder’s <br />selected trenchless pipeline construction specialty subcontractor <br />for the Project has successfully completed the three trenchless <br />pipeline installations using pipe ramming, jacking, or <br />microtunneling methods for stormwater or municipal wastewater <br />conveyance pipelines with a carrier pipe diameter of at least 30 <br />inches within ten (10) years prior to bid opening. At least two <br />separate specialty subcontractor projects must be used to satisfy <br />this alternative requirement. This alternative requirement may not <br />be satisfied by a combination of Bidder and specialty <br />subcontractor projects. If the Bidder uses this alternative