My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 22 13 - 3 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 22 13 - 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />e. Management of subcontractors; <br />f. Availability of and use of appropriate equipment; <br />g. Compliance with contract documents; <br />h. Management of submittals process, change orders, and close-out. <br />B. Mandatory Pre-Bid Meeting <br />1. Criterion: Bidder shall have attended a mandatory pre-bid meeting in <br />accordance with Section 00 25 13. <br />2. Documentation: The Bidder shall have signed the sign-in sheet at a mandatory <br />pre-bid meeting. <br />1.3 PROCEDURE <br />A. Requests for Criteria Modification. <br />1. A Bidder may request that City modify the supplemental bidder responsibility <br />criteria listed above. This request must be in writing to the City project manager <br />and must be received by the City project manager at least ten business days <br />before the bid opening. The City project manager will evaluate the information <br />submitted by the Bidder and will respond within three business days after receipt <br />of the request. If City evaluation results in a change of the criteria, the City will <br />issue an addendum to the bid documents identifying the new or revised criteria. <br />Any protest of a City decision regarding a request for criteria modification must <br />be in strict conformity with Everett Municipal Code Chapter 3.46, Bid Protest <br />Procedures. <br />B. Additional Information. <br />1. The City may require that the Bidder submit information in addition to the <br />Bidder’s Supplemental Responsibility Statement. The City may require <br />supplementation or revision of the Bidder’s Supplemental Responsibility <br />Statement. The City also reserves the right to obtain information from third <br />parties and independent sources of information concerning a Bidder’s <br />compliance with the mandatory and supplemental criteria, and to use that <br />information in their evaluation. The City may consider mitigating factors in <br />determining whether the Bidder complies with the requirements of the <br />Supplemental Criteria.
The URL can be used to link to this page
Your browser does not support the video tag.